[ 1 ] - Inventory Cost Evaluation Under VMI Program with Lot Splitting
This paper aims to evaluate inventory cost of a Two-echelon serial supply chain system under vendor managed inventory program with stochastic demand, and examine the effect of environmental factors on the cost of overall system. For this purpose, we consider a two-echelon serial supply chain with a manufacturer and a retailer. Under Vendor managed inventory program, the decision on inventory ...
[ 2 ] - Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy
Consider a two-level inventory system consisting of one supplier and one retailer. The retailer faces a Poisson demand with a known rate and applies base stock (one-for-one ordering) policy. That is, his inventory position is set to a pre-determined level, so the demand pattern is transferred exactly to the supplier. The supplier has an inventory system and a service unit with exponentially dis...
[ 3 ] - Budgetary Constraints and Idle Time Allocation in Common-Cycle Production with non-zero Setup Time
Economic lot size scheduling problem (ELSP) for a multi-product single machine system is a classical problem. This paper considers ELSP with budgetary constraint as an important aspect of such systems. In the real world situations the available funds for investment in inventory is limited. By adopting the common cycle time approach to ELSP, we obtain the optimal common cycle which minimizes the...
[ 4 ] - Optimal Batch Production for a Single Machine System with Accumulated Defectives and Random Rate of Rework
In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...
[ 5 ] - Optimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time
In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...
[ 6 ] - Second Moment of Queue Size with Stationary Arrival Processes and Arbitrary Queue Discipline
In this paper we consider a queuing system in which the service times of customers are independent and identically distributed random variables, the arrival process is stationary and has the property of orderliness, and the queue discipline is arbitrary. For this queuing system we obtain the steady state second moment of the queue size in terms of the stationary waiting time distribution of a s...
[ 7 ] - Optimum Aggregate Inventory in the Lot Scheduling Problem with Non-Zero Setup Time
In this paper, the minimization of the maximum aggregate inventory of all products for the common cycle time approach to the scheduling problem of a multi-products single machine system is considered. In the case of non-zero set up time and limited resources, a simply and easy to apply rule has been obtained for this optimization problem. Using this rule, one can obtain the optimal production s...