Budgetary Constraints and Idle Time Allocation in Common-Cycle Production with non-zero Setup Time

نویسندگان

  • Ali Ardalan College of Business and Public Administration, Old Dominion University, Virginia 23529
  • Alireza Haji Dept. of Industrial Engineering, Sharif University of Technology, Teharan, Iran
  • Rasoul Haji Dept. of Industrial Engineering, Sharif University of Technology, Teharan, Iran
چکیده مقاله:

Economic lot size scheduling problem (ELSP) for a multi-product single machine system is a classical problem. This paper considers ELSP with budgetary constraint as an important aspect of such systems. In the real world situations the available funds for investment in inventory is limited. By adopting the common cycle time approach to ELSP, we obtain the optimal common cycle which minimizes the total inventory ordering and holding costs for the case of nonzero setup times. One aspect of the scheduling is to decide what should be the sequence of production runs and how the idle times shall be distributed in the common cycle time. For such a sequencing problem, we consider two cases: a) the common cycle time is given, and b) the common cycle time is a decision variable. In the literature, scheduling rules are introduced for both cases, which assume that the total idle time is located at the end of each cycle. This paper relaxes this assumption and provides: i) a rule to optimize the production sequence and the length of idle times before (or after) producing each item, for both cases (a) and (b), and ii) the optimal common cycle for case (b). The presented rule is interestingly general, simple and easy-to-apply.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimum Aggregate Inventory in the Lot Scheduling Problem with Non-Zero Setup Time

In this paper, the minimization of the maximum aggregate inventory of all products for the common cycle time approach to the scheduling problem of a multi-products single machine system is considered. In the case of non-zero set up time and limited resources, a simply and easy to apply rule has been obtained for this optimization problem. Using this rule, one can obtain the optimal production s...

متن کامل

Optimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time

In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...

متن کامل

A Zero-Inventory Production-Distribution Problem with Time-Window Constraints

In this paper, we study a sub-problem of integrated production and distribution for a perishable product that cannot be inventoried. The manufacturing facility has a limited production rate, and the delivery truck has a non-negligible traveling time between locations. The order in which customers may receive deliveries is fixed. Each customer requests a delivery quantity and a time window for r...

متن کامل

An EPQ model for an imperfect production process with fuzzy cycle time and quality screening

This study has developed a production inventory model where the cycle timeis fuzzy, the existence of defective products is assumed in each batch andproduct screening is performed both in-production and after-production.Triangular fuzzy numbers serve to model uncertainties in the cycle time, anda fuzzified total inventory profit function is created by thedefuzzifica...

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

An Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items

In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 4  شماره 1

صفحات  18- 32

تاریخ انتشار 2010-04-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023