Optimal Batch Production for a Single Machine System with Accumulated Defectives and Random Rate of Rework

نویسندگان

  • Babak Haji Industrial Engineering, Sharif unversity of technology, Teharan, Tehran, Iran
  • Rasoul Haji Industrial Engineering, Sharif unversity of technology, Teharan, Tehran, Iran
چکیده مقاله:

In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world situation that the unit rework processing cost need not to be equal to unit normal processing cost. We consider the case in which during a specified period of time consisting of several cycles the rework process takes place only in its last cycle. For practical reasons such as the ease of production scheduling and resource planning we require that the length of the last cycle must have the same length as the other cycles of this period. For this purpose we assume in the last cycle of this period first the normal production starts after which the rework of all defective units produced in the period begins. After the end of the last cycle of the period the whole process will start all over again. Further we assume that, for reduction of set up cost for rework per unit time, the total number of setups for rework must be as small as possible. For this system we derive the expected total cost function consisting of inventory holding, waiting time of defectives for rework, setup, and processing costs per unit time. Then we obtain the economic batch quantity which minimizes this expected cost.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles

In this paper we consider a single machine system that produces items part of which are defective. The defective items produced in a time period, consisting of several equal cycles, are accumulated and are all reworked in the last cycle of this period called the rework cycle. At the end of the rework cycle the whole process will start all over again. The first significant objective of this stud...

متن کامل

Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles

The first significant objective of this study is that, for the ease of production and resource planning, the rework cycle has to have the same length as the other cycles. The other objective is that the number of rework cycles be as small as possible, because of changeover costs needed for going from normal production to rework as well as special attention required for rework to satisfy the zer...

متن کامل

A Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes

In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem.  Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...

متن کامل

The Single Machine Serial Batch Production Sceduling with Outsourcing Allowed

Original scientific paper We consider several serial batch scheduling problems with outsourcing allowed. Each job can be either processed on the in-house machine or outsourced. The objective is to minimize the weighted sum of the scheduling cost and the total outsourcing cost. We discuss three classical scheduling objective functions. The first is the total completion time, the second is the ma...

متن کامل

Optimization Models for a Deteriorating Single Server Queuing Production System

 In this paper a single server queuing production system is considered which is subject to gradual deterioration. The system is discussed under two different deteriorating conditions. A planning horizon is considered and server which is a D/M/1 queuing system is gradually deteriorates through time periods. A maintenance policy is taken into account whereby the server is restored to its initial ...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 3  شماره 4

صفحات  243- 256

تاریخ انتشار 2010-02-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023