[ 1 ] - UPL determination of multi-element deposits with grade uncertainty using a new block economic value calculation approach
The block economic value (BEV) of a single-metal deposit is calculated based on the metal content and the related costs. The common methods available for calculating BEV are just based upon the profitable elements, and the effects of undesirable elements on BEV are not considered. However, in multi-element deposits, the effects of other elements existing in the blocks on BEV should be considere...
[ 2 ] - Cutoff grades optimization with environmental management A case study: Sungun Copper Project
Cutoff grade is a grade used to assign a destination label to a parcel of material. The optimal cutoff grades depend on all the salient technological features of mining, such as the capacity of extraction and of milling, the geometry and geology of the orebody, and the optimal grade of concentrate to send to the smelter. The main objective of each optimization of mining operation is to maximize...
[ 3 ] - An Uncertainty-based Transition from Open Pit to Underground Mining
There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...
[ 4 ] - A New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure
One of the most important issues in all stages of mining study is capital cost estimation. Determination of capital expenditure is a challenging issue for mine designers. In recent decade, quite a few number of studies have focused on proposing estimation models to predict mining capital cost. However, these efforts have not achieved to a predictor model with reliable range of error. Both of ov...
[ 5 ] - Multiple Destination Influence on Production Scheduling in Multi-element Mines
In multi-element deposits, different blocks are blended together to create a product with a predetermined quality. Generally, blending aims to obtain a special quality and quantity based on determining the processing plant or customer needs. However, blending causes different products based on the deposit properties. Thus, a block is blended with others to create one of many possible products. ...
[ 6 ] - Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty
Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...
[ 7 ] - An Approach to Locate an in Pit Crusher in Open Pit Mines
Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....
[ 8 ] - A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
[ 9 ] - Using 2D Lerchs and Grossmann Algorithm to Design Final Pit Limits of Sungun Copper Deposit of Iran (TECHNICAL NOTE)
The Sungun copper deposit is located in about 40km north west of Ahar city in the east Azarbaigan province of Iran. The total geological ore deposit is estimated to be 740 million tons. In this study using all information from exploration and geotechnical studies of the area, final pit limits of Sungun copper deposit is designed by the 2-D Lerchs & Grossmann Algorithm. By this method, from 740 ...
[ 10 ] - Determination of Blasthole Parameters Based on Field Results (TECHNICAL NOTE).
Correct selection of coefficients for blasthole parameters in Ghalat limestone mine in Shahr-e-kord of Iran has resulted is designing and performing 20 blasting operations. After each blast, fragmented rocks larger than one square meter, called oversize, are estimated and prepared for secondary blasting. Next blasthole pattern were designed based on previous blasting results. The results of the...
[ 11 ] - A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...