An Approach to Locate an in Pit Crusher in Open Pit Mines
Authors
Abstract:
Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem. In selecting the optimum location, two factors are considered. First, the overall haulage cost is minimized, and second, the location is chosen such that it is not located inside the mining area, and crusher site is fixed through a period of at least one year. Application of single hub problem is quite effective in determining the location of the in pit crusher. The method is applied in Sarcheshmeh copper mine, to determine the optimum location of the in pit crushing and conveying system.
similar resources
An Uncertainty-based Transition from Open Pit to Underground Mining
There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...
full textDetermination of the largest pit with the non-negative net profit in the open pit mines
The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...
full textDetermination of Ultimate Pit Limits in Open Mines Using Real Option Approach
Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...
full textA new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...
full textA Hybrid Fuzzy MCDM Approach to Determine an Optimal Block Size in Open-Pit Mine Modeling: a Case Study
The computer-based 3D modeling of ore bodies is one of the most important steps in the resource estimation, grade determination, and production scheduling of open-pit mines. In the modeling phase, the volume of the orebody model is required to be filled by the blocks and sub-blocks. The determination of Block Size (BS) is important due to the dependence of the geostatistical issues and calculat...
full textUtci for Assessing Heat Stress in Open-pit Mines
The purpose of this article is to examine the applicability of Universal Thermal Climate Index (UTCI) index as an innovative index for evaluating of occupational heat stress in outdoor environments. 175 workers of 12 open-pit mines in Tehran, Iran were selected for this research study. First, the environmental variables such as air temperature, wet-bulb temperature, globe temperature, relative ...
full textMy Resources
Journal title
volume 27 issue 9
pages 1475- 1484
publication date 2014-09-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023