Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an uncertainty-based problem. Feed quality is a prerequisite for the mill designer. It affects the mill efficiency and the type of measures with respect to environmental regulations. There is a need to control and to predict the quality of feed at the mine site to meet mill requirements, which is a complex problem. To deal with this issue a stochastic optimization model is developed to capture the effects of resource uncertainties on mine planning. In that regard, three performance indicators are defined and an optimized mining schedule is used to simulate the performance of these indicators throughout the mine-life. This will quantify the effects of geological uncertainty on short-term and long-term plans. The objectives of the model also include minimizing the deviation of expected quality and quantity from the required values. The methodology was illustrated using a case study on a surface gold mine in Iran. This approach leads to resilient decisions and better quality control.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method

Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...

full text

A practical approach to open-pit mine planning under price uncertainty using information gap decision theory

In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality o...

full text

Risk Averse Approaches in Open-pit Production Planning under Ore Grade Uncertainty: a Ultimate Pit Study

During early phases of open-pit mining production planning many parameters are uncertain, and since the mining operation is performed only once, any evaluations based only on on average outcomes neglects the very real chance of obtaining an outcome that is below average. Taking into account also that operation costs are considerable and the mining horizon usually extends over several decades it...

full text

commodity price uncertainty propagation in open-pit mine production planning by latin hypercube sampling method

production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (npv) subject to some operational and technical constraints. this process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. the commodity price uncertainty is among ...

full text

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

full text

Demand forecasting and decision making under uncertainty for long-term production planning in aviation industry

The aviation industry represents a complex system with low-volume high-value manufacturing, long lead times, large capital investments, and highly variable demand. Making important decisions with intensive capital investments requires accurate forecasting of future demand. However, this can be challenging because of significant variability in future scenarios. The purpose of this research is to...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 29  issue 7

pages  1022- 1028

publication date 2016-07-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023