نتایج جستجو برای: weighted tardiness
تعداد نتایج: 101723 فیلتر نتایج به سال:
Total weighted tardiness is a measure of customer satisfaction. Minimizing it represents satisfying the general requirement of on-time delivery. In this research, we consider an ant colony optimization (ACO) algorithm to solve the problem of scheduling unrelated parallel machines to minimize total weighted tardiness. The problem is NP-hard in the strong sense. Computational results show that th...
in this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. in this problem, we assume constrained resources are renewable and limited to very costly machines and tools which are also used in other projects and are not accessible in all periods of time of a project. in other words, there is a dictated ready date as well as a d...
This paper surveys the literature related to solving traditional unrelated parallel-machine scheduling problems. It compiles algorithms for the makespan, total weighted sum of completion times, maximum tardiness, total tardiness, total earliness and tardiness, and multiple criteria performance measures. The review of the existing algorithms is restricted to the deterministic problems without se...
In this paper we study the resource-constrained project scheduling problem with weighted earliness-tardiness penalty costs. Project activities are assumed to have a known deterministic due date, a unit earliness as well as a unit tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in order to minimize the total weighted earliness-tard...
In many manufacturing systems, jobs that are completed early are held as finished-goods inventory until their due-dates, and hence we incur earliness costs. Similarly, jobs that are completed after their due-dates incur penalty. The objective in such situations would, therefore, be to meet the due-dates of the respective jobs as closely as possible, and consequently minimize the sum of earlines...
This paper describes a genetic algorithm approach to the dynamic job shop scheduling problem with jobs arriving continually. Both deterministic and stochastic models of the dynamic problem were investigated. The objective functions examined were weighted flow time, maximum tardiness, weighted tardiness, weighted lateness, weighted number of tardy jobs, and weighted earliness plus weighted tardi...
This paper presents the fuzzy mixed-integer goal programming model for a single machine scheduling problem with bi-objectives consisting of the minimization of the total weighted flow time and total weighted tardiness. This model is solved by a fuzzy goal programming approach to verify and validate the proposed approach for the above problem. Two test problems in small and large sizes are gener...
A hybrid shifting bottleneck-tabu search heuristic for the job shop total weighted tardiness problem
In this paper, we study the job shop scheduling problem with the objective of minimizing the total weighted tardiness. We propose a hybrid shifting bottleneck tabu search (SB-TS) algorithm by replacing the reoptimization step in the shifting bottleneck (SB) algorithm by a tabu search (TS). In terms of the shifting bottleneck heuristic, the proposed tabu search optimizes the total weighted tardi...
Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness
Abstract: This paper considers a bi-criteria scheduling on parallel machines in fuzzy environment which optimizes the weighted flow time and maximum tardiness. The fuzziness, vagueness or uncertainty in processing time of jobs is represented by triangular fuzzy membership function. The bi-criteria problem with weighted flow time and maximum tardiness as primary and secondary criteria, respectiv...
We study the parallel machine scheduling problem with release dates and we consider several “min-sum” objective functions including total weighted tardiness, total tardiness, total weighted completion time and total completion time. We describe several lower bounds for these problems, most of them being original ones. We provide experimental results to compare these lower bounds according to th...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید