نتایج جستجو برای: up power
تعداد نتایج: 1367177 فیلتر نتایج به سال:
a laboratory stirred tank bioreactor with six single and dual-impeller configurations was tested to obtain the optimum operating conditions for future biological processes. six impeller combinations consisting of three basic impeller types, namely rushton turbine (rt), pitched 4blade (p4b) and pitched 2blade (p2b) downward flow were investigated in 1.77 l bioreactor working volume. power consum...
determination of the starter torque-speed diagram is a major task in the design or selection of a proper gas turbine starter. in this paper, the maximum power of the mgt-40 gas turbine starter was calculated based on the dynamics of the rotor, start-up logic, and compressor map. in a recent research, the pressure ratio was assumed as a linear function of the rotor speed and the required starter...
the aim of the current study was to investigate the relationship among efl learners learning style preferences, use of language learning strategies, and autonomy. a total of 148 male and female learners, between the ages of 18 and 30, majoring in english literature and english translation at islamic azad university, central tehran were randomly selected. a package of three questionnaires was ad...
In this paper, a method of low power analog testing is proposed. In spite of having Oscillation Based Built in Self-Test methodology (OBIST), a look up table based (LUT) low power testing approach has been proposed to find out the faulty circuit and also to sort out the particular fault location in the circuit. In this paper an operational amplifier, which is the basic building block in the ana...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید