نتایج جستجو برای: tardiness cost

تعداد نتایج: 388570  

Journal: :journal of optimization in industrial engineering 0
behrouz afshar nadjafi department of industrial engineering, islamic azad university of qazvin, qazvin, iran, shahram shadrokh department of industrial engineering, sharif university of technology, tehran, iran,

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

2006
Yann Hendel Francis Sourd

We use the Akers-Friedman geometric approach to solve the two jobs job-shop problem when there is an earliness cost on the first operation and a tardiness cost on the last operation of each job. We then generalize the problem by imposing earliness and tardiness costs on each operation and finally, we solve it using a dynamic programming algorithm. KeywordsEarliness-tardiness scheduling, Polyn...

Journal: :Computers & Industrial Engineering 2005
S. Thiagarajan Chandrasekharan Rajendran

In many manufacturing systems, jobs that are completed early are held as finished-goods inventory until their due-dates, and hence we incur earliness costs. Similarly, jobs that are completed after their due-dates incur penalty. The objective in such situations would, therefore, be to meet the due-dates of the respective jobs as closely as possible, and consequently minimize the sum of earlines...

Journal: :journal of optimization in industrial engineering 2010
behrouz afshar nadjafi shahram shadrokh

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

Farhad Ghassemi-Tari Laya Olfat

Four heuristic algorithms are developed for solving the generalized version of tardiness flow shop problems. We consider the generalized tardiness flow shop model with minimization of the total tardiness as its performance measure. We modify the concept of cost over time (COVERT) for the generalized version of the flow shop tardiness model and employ this concept for developing four algorithms....

Journal: :Annals OR 2001
Mario Vanhoucke Erik Demeulemeester Willy Herroelen

In this paper we study the resource-constrained project scheduling problem with weighted earliness-tardiness penalty costs. Project activities are assumed to have a known deterministic due date, a unit earliness as well as a unit tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in order to minimize the total weighted earliness-tard...

2007
Jan Kelbel Zdeněk Hanzálek

This paper describes a constraint programming approach to solving a scheduling problem with earliness and tardiness cost using a problem specific search procedure. The presented algorithm is tested on a set of randomly generated instances of the job shop scheduling problem with earliness and tardiness costs. The experiments are executed also for three other algorithms, and the results are then ...

2010
Chao-Tang Tseng Ying-Chun Chou Wan-Yin Chen

A new type of tardy cost, called stepwise tardiness, is considered in a single machine problem. The stepwise tardiness scheduling has been found in many practical situations. To the best of our knowledge, there exist few studies directly addressing the problem. In this paper, we develop a heuristic for the single machine total stepwise tardiness (SMTST) problem. In addition, a variable neighbor...

Journal: :Journal of Industrial and Management Optimization 2023

This paper investigates the single-machine due-window assignment scheduling with truncated learning effects and past-sequence-dependent setup times simultaneously. The scheduler has option of job-rejection, i.e., some jobs are processed other rejected. Under three (i.e., common, slack different) methods, our goal is to minimize sum a general earliness-tardiness cost weighted earliness-tardiness...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید