نتایج جستجو برای: stage assembly flowshop
تعداد نتایج: 478308 فیلتر نتایج به سال:
The assembly flowshop scheduling problem has been studied recently due to its applicability in real life scheduling problems. It arises when various fabrication operations are performed concurrently in one stage. It was firstly introduced by Lee et al. (1993) in a flowshop environment. Later, Potts et al. (1995) considered the two-stage assembly flowshop problem with m concurrent operations in ...
in this paper, three-stage assembly flowshop scheduling is considered with respect to minimizing bi-objectives, namely mean flow time and mean tardiness. this problem is a model of production systems, which several production operations are done simultaneously and independently, and then produced components are collected and transferred to an assembly stage for the final operation. in this mode...
This paper discusses a two-stage assembly-type flowshop scheduling problem with batching considerations subject to a fixed job sequence. The two-stage assembly flowshop consists of m stage-1 parallel dedicated machines and a stage-2 assembly machine which processes the jobs in batches. Four regular performance metrics, namely, the total completion time, maximum lateness, total tardiness, and nu...
The two-stage assembly flowshop scheduling problem is addressed with the objective of minimizing total tardiness. An insertion algorithm, a genetic algorithm, and a hybrid of the insertion and genetic algorithms, are developed for the problem. Conducted computational experiments reveal that the hybrid algorithm significantly outperforms the genetic algorithm while the best performing algorithm ...
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...
This paper proposes a heuristic algorithm, called list-based squeezing branch and bound algorithm, for solving a machine-fixed, machining-assembly flowshop scheduling problem to minimize makespan. The machine-fixed, machining-assembly flowshop consists of some parallel two-machine flow lines at a machining stage and one robot at an assembly stage. Since an optimal schedule for this problem is n...
This paper addresses a three-machine assembly-type flowshop scheduling problem, which frequently arises from manufacturing process management as well as from supply chain management. Machines one and two are arranged in parallel for producing component parts individually, and machine three is an assembly line arranged as the second-stage of a flowshop for processing the component parts in batch...
We consider flowshop environments that consist of multiple stages and multiple machines in each stage. The flowshops are flexible in the sense that a task within a stage can be processed by any of the machines in the stage. We refer to this design as the hybrid flowshop. Our objective is to schedule a set of n jobs so as to minimize makespan. The problem is NP-complete even in the case of a sin...
In this paper, three-stage assembly flowshop scheduling is considered with respect to minimizing bi-objectives, namely mean flow time and mean tardiness. This problem is a model of production systems, which several production operations are done simultaneously and independently, and then produced components are collected and transferred to an assembly stage for the final operation. In this mode...
Integrated scheduling of distributed manufacturing operations has implications for supply chain optimization and requires further investigations to facilitate its application area various industry settings. This study extends the limited literature two-stage production-assembly problems offering a twofold contribution. First, an original mathematical extension, Distributed Two-Stage Assembly Fl...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید