نتایج جستجو برای: ramp rate limits

تعداد نتایج: 1073216  

Journal: :journal of artificial intelligence in electrical engineering 2012
ali nazari amin safari hossein shayeghi

this paper presents a biogeography-based optimization (bbo) algorithm to solve the economic loaddispatch (eld) problem with generator constraints in thermal plants. the applied method can solvethe eld problem with constraints like transmission losses, ramp rate limits, and prohibited operatingzones. biogeography is the science of the geographical distribution of biological species. the modelsof...

2012
Duehee Lee Joonhyun Kim Ross Baldick

This paper suggests the operation polices of storage devices to limiting ramp rates of wind power output. Operation polices are based on the optimization framework of linear programming under the assumption that there is a penalty cost for deviating outside ramp rate limits. Policies decide optimal storage operations to minimize the total penalty costs incurred when violating ramp rate limits. ...

Journal: :journal of operation and automation in power engineering 2015
r. sedaghati f. namdari

one of the significant strategies of the power systems is economic dispatch (ed) problem, which is defined as the optimal generation of power units to produce energy at the lowest cost by fulfilling the demand within several limits. the undeniable impacts of ramp rate limits, valve loading, prohibited operating zone, spinning reserve and multi-fuel option on the economic dispatch of practical p...

One of the significant strategies of the power systems is Economic Dispatch (ED) problem, which is defined as the optimal generation of power units to produce energy at the lowest cost by fulfilling the demand within several limits. The undeniable impacts of ramp rate limits, valve loading, prohibited operating zone, spinning reserve and multi-fuel option on the economic dispatch of practical p...

Journal: :journal of advances in computer research 2014
mostafa ramzanpour hamdi abdi

nowadays, economic load dispatch between generation units with least cost involved is one of the most important issues in utilizing power systems. in this paper, a new method i.e. water cycle algorithm (wca) which is similar to other intelligent algorithm and is based on swarm, is employed in order to solve the economic load dispatch problem between power plants. wca is used to solve complicate...

امینی, امیر, فلقی, حمید, نجفی, ارسلان ,

Economic dispatch as an important problem in production management and power system operation, is studied here with a view to improve realistic simulation, considering practical limitations such as valve point effect, ramp rate limits, prohibited operating zones, multiple fuel sources and power transmission losses. Hence, a new optimization method is proposed based on modified shuffled frog lea...

2012
Samir SAYAH Abdellatif HAMOUDA Ferhat Abbas

Economic power dispatch (EPD) is one of the main tools for optimal operation and planning of modern power systems. To solve effectively the EPD problem, most of the conventional calculus methods rely on the assumption that the fuel cost characteristic of a generating unit is a continuous and convex function, resulting in inaccurate dispatch. This paper presents the design and application of eff...

2005
A. Hegyi B. De Schutter H. Hellendoorn Andreas Hegyi Bart De Schutter Hans Hellendoorn

We apply model predictive control to optimally coordinate variable speed limits and ramp metering. The basic idea is that speed limits can increase the (density) range in which ramp metering is useful. For the prediction we use a slightly adapted version of the METANET traffic flow model that takes the variable speed limits into account. The optimal control signals aim at minimizing the total t...

2011
U. K. Rout R. K. Swain A. K. Barisal R. C. Prusty

This paper presents clonal selection algorithm to solve the Dynamic Economic Dispatch Problem (DEDP) of generating units considering valve point loading effects. It determines the optimal operation of units with predicted load demand over a certain period of time with an objective to minimize total production cost while the system is operating with ramp rate limits. This paper presents DED base...

Journal: :International journal of sports physiology and performance 2006
Oliver Faude Tim Meyer Wilfried Kindermann

PURPOSE The work rate (WR) corresponding to ventilatory threshold (VT) is an appropriate intensity for regenerative and low-intensity training sessions. During incremental ramp exercise, VO(2) increase lags behind WR increase. Traditionally, a VO(2) time delay (t(d)) of 45 seconds is used to calculate the WR at VT from such tests. Considerable inaccuracies were observed when using this constant...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید