نتایج جستجو برای: main building

تعداد نتایج: 790329  

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه گیلان - دانشکده فنی و مهندسی 1390

sange siyah dam is located two kilometers down the kabod khani village. the environ of ghorrve city in kurdestan province. this is an clay core dam. in this dam instrumentation is performed in three section and consist of electrical piezometers, total pressure cells, settlement cells and so on. the main objective of instrumentation is to control the behavior of dam body and foundation, end else...

Journal: :Acta Crystallographica Section A Foundations of Crystallography 2005

Journal: :Journal of the Korean Wood Science and Technology 2016

Journal: :Jurnal Teknik Mesin 2022

Plumbing system planning is an important part of a building to meet clean water needs. This study aims plan plumbing for in the ITP main building. Meeting needs planned use sources from shallow wells that are pumped into roof tank (roof tank) and flowed gravitationally pump two. The results calculation average requirements office buildings 53 liters / day. capacity needed accommodate 2,100 lite...

Journal: :Herald of Dagestan State Technical University. Technical Sciences 2014

Journal: :Asian Journal of Physical Education & Recreation 2003

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید