نتایج جستجو برای: girder span

تعداد نتایج: 46047  

2013
Wang Hui-Li Tan Yan-Bin Qin Si-Feng Zhang Zhe

Geometric nonlinearity of self-anchored cable-stayed suspension bridges is studied in this paper. The repercussion of shrinkage and creep of concrete, rise-to-span ratio, and girder camber on the system is discussed. A self-anchored cable-stayed suspension bridge with a main span of 800 m is analyzed with linear theory, second-order theory, and nonlinear theory, respectively. In the condition o...

2010
Wen-Liang Qiu Chin-Sheng Kao Chang-Huan Kou Jeng-Lin Tsai Guang Yang

This paper presents a stability investigation of a special-shape arch bridge with a span of 180 m. Its structure and mechanics are significantly different from normal arch bridges because of its single arch rib skewing across the girder, its hangers hanging unevenly along the arch rib with different aslant angle, and its arch rib being subjected to massive axial compression force, bending momen...

2014
Wenliang Qiu Meng Jiang Cailiang Huang

The girder of self-anchored suspension bridge is subjected to large compression force applied by main cables. So, serious damage of the girder due to breakage of hangers may cause the collapse of the whole bridge. With the time increasing, the hangers may break suddenly for their resistance capacities decrease due to corrosion. Using nonlinear static and dynamic analysis methods and adopting 3D...

Journal: :iranian journal of science and technology transactions of mechanical engineering 2015
m. abid m. h. akmal h. a. wajid

double bridge girder overhead cranes are used for heavy duty applications in theindustry. in this paper a detailed parametric design optimization of the main girder of box type isperformed for a 150ton capacity and 32m long span crane, after its basic design using availabledesign rules. design optimization is performed using detailed 3d finite element analysis bychanging the number, shape and l...

2010
Hao Wang Aiqun Li Ruomei Hu Jian Li

The streamline flat steel box girder is broadly used in long span cablesupported bridges all over the world. As one of the most important part of the bridges, its stress level and distribution under various dynamic loads are especially concerned. However, it is difficult to obtain the accurate stress of the steel box girder by common finite element (FE) calculation. The Runyang Suspension Bridg...

2007
Michael G. Oliva Jeffrey S. Russell

This presentation describes the concepts involved in design and construction of a reinforcement-free bridge deck intended to provide cost effective, durable and more rapid construction for highway bridges. The new wide flanged or bulb tee precast prestressed concrete girder sections currently used in bridges allow for a shorter effective span for the bridge deck because of the wide girder flang...

2006
Mark Guzda Baidurya Bhattacharya Dennis R. Mertz

It has been argued that the AASHTO LRFD design code for maximum live loads on highway bridges is overly conservative. In an attempt to determine the level of conservativeness, if any, the writers developed a methodology incorporating real-time visual data collection from traffic cameras coupled with structural strain response of girder bridges. Average daily truck traffic along with frequency o...

Journal: :نشریه مهندسی عمران و نقشه برداری 0
امیرحسین قربانپور دانشگاه تهران مهدی قاسمیه دانشگاه تهران

composite steel concrete composite floor used mainly in the commercial and office building has lighter weight and is considered very economical. the light weight natures of this type of floor causes some vibration problems when it is subjected to loadings such as human footstep loading. the dynamic characteristics of these floors are dependent on several parameters such as joist span, girder sp...

2012
Zdeněk P. Bažant Qiang Yu Guang-Hua Li

The segmental prestressed concrete box girder of Koror-Babeldaob (KB) Bridge in Palau, which had a record span of 241 m (791 ft), presents a striking paradigm of serviceability loss because of excessive multidecade deflections. The data required for analysis have recently been released and are here exploited to show how the analysis and design could be improved. Erected segmentally in 1977, thi...

2004
COLIN GAGG

Numerous new bridges were needed when the railway line from London to Holyhead in Wales was built in the 1840s. The project’s chief engineer, Robert Stephenson, chose a cast iron girder design to cross the river Dee just outside Chester, and the bridge was finished in November 1846. About six months later, on 24 May 1847, a local train was crossing the final span when one of the girders failed ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید