Strategic bidding in joint energy and spinning reserve markets is a challenging task from the viewpoint of generation companies (GenCos). In this paper, the interaction between energy and spinning reserve markets is modeled considering a joint probability density function for the prices of these markets. Considering pay-as-bid pricing mechanism, the bidding problem is formulated and solved as a...

2017
H. Rajabi

Strategic bidding in joint energy and spinning reserve markets is a challenging task from the viewpoint of Generation Companies (GenCos). In this paper, the interaction between energy and spinning reserve markets is modeled considering a joint probability density function for the prices of these markets. Considering pay-as-bid pricing mechanism, the bidding problem is formulated and solved as a...

In an electricity market, every generation company (GENCO) attempts to maximize profit according to other participants bidding behaviors and power systems operating conditions. The goal of this study is to examine the optimal bidding strategy problem for GENCOs in energy and spinning reserve markets based on a hybrid GA-heuristic optimization algorithm. The heuristic optimization algorithm used...

Journal: :Decision Support Systems 2005
Ashkan Kian Ali Keyhani

Reliable and efficient operation of deregulated electricity markets requires supply and demand elasticity. This paper presents incentive control of spinning reserves in electricity multi-markets using game theory. Interruptible load contracts (ILC) could reduce the amount of spinning reserve requirements during system contingencies such as transmission congestion. It is shown that the power uti...

Due to uncertain nature of wind and photovoltaic power units, the participation of this units in electricity markets is subjected to significant deviation penalties. This issue leads to despondency or even admission of these units in the competitive environment. With regard to this fact that the low deviations are available when predictions are performed in a short-term horizon and also distrib...

ستایشنظر, مهرداد, نظام‌آبادی, حسین,

This paper addresses the bidding problem faced by a virtual power plant (VPP) in energy, spinning reserve service, and reactive power service market simultaneously. Therefore, a non-equilibrium model based on security constraints price-based unit commitment (SCPBUC), which is take into account the supply-demand balancing and security constraints of VPP, is proposed. By the presented model, VPP ...

Journal: :international journal of smart electrical engineering 2015
iman narimani saeed reza goldani

due to uncertain nature of wind and photovoltaic power units, the participation of this units in electricity markets is subjected to significant deviation penalties. this issue leads to despondency or even admission of these units in the competitive environment. with regard to this fact that the low deviations are available when predictions are performed in a short-term horizon and also distrib...

2014
K. Tomsovic

It has been widely accepted that demand response will play an important role in reliable and economic operation of future power systems and electricity markets. Demand response can not only influence the prices in the energy market by demand shifting, but also participate in the reserve market. In this paper, we propose a full model of demand response in which demand flexibility is fully utiliz...

Intermittent nature of wind power faced ISO and power producers with new challenges. Wind power uncertainty has increased the required reserve capacity and deployment reserve. Consequently, large-scale wind power generation increases ISO costs and consequently reserve prices. On the other hand, since wind power producers are price taker, large-scale wind power generation decreases residual dema...

شیخ‌الاسلامی, محمدکاظم, سیفی, حسین , لطیفی , محمدامین , میردار, مرتضی ,

Individual Distributed Energy Resources (DERs) do not have sufficient capacity, flexibility or controllability to participate in the electricity markets.  By aggregation of some individual DERs into a Virtual Power Plant (VPP), this problem may be resolved. Under this concept, individual DERs would be able to gain access and visibility across the electricity markets. The aim of this paper ...