A method is described to assign product due dates for multistage assemblies with uncertain manufacturing and assembly process times. Earliest start times of operations are specified by a predetermined production plan and processing time distributions for operations are truncated at minimum processing times. The method systematically decomposes the complex product structures of multistage assemb...