نتایج جستجو برای: block sequencing
تعداد نتایج: 284704 فیلتر نتایج به سال:
Waste rock dumping is very important in the production planning of open-pit mines. This subject is more crucial when there is a potential of acid-forming (PAF) by waste rocks. In such a type of mines, to protect the environment, the PAF materials should be encapsulated by non-harmful rocks. Therefore, block sequencing of the mined materials should be in such a way that both the environmental an...
A classical problem in the mining industry for open-pit mines involves scheduling the production of notional three-dimensional production blocks, each containing a predetermined amount of ore and waste. That is, given operational resource constraints on extraction and processing, we seek a net present value-maximizing schedule of when, if ever, to extract each block in a deposit. We present a v...
this is an original study on the effect of a polyisobutylene – polydimethylsiloxane (pibpdms) block copolymer modifier used as an interfacial active agent on the dynamics behaviour of single newtonian drops suspended in a polyisobutylene (pib) newtonian matrix. the results were divided in two sections. the first part included the experiments carried out on the non-modified and 2% block cop...
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
When testing association between rare variants and diseases, an efficient analytical approach involves considering a set of variants in a genomic region as the unit of analysis. One factor complicating this approach is that the vast majority of rare variants in practical applications are believed to represent background neutral variation. As a result, analyzing a single set with all variants ma...
open-pit production scheduling (opps) problem focuses on determining a block sequencing and scheduling to maximize net present value (npv) of the venture under constraints. the scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. in order to deal with the opps uncertainties, various approaches can be recommended. robust opti...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید