Journal: :education policy analysis archives 1999

Journal: :journal of mining and environment 0
a. alipour school of mining engineering, college of engineering, university of tehran, tehran, iran a. a. khodaiari school of mining engineering, college of engineering, university of tehran, tehran, iran a. jafari school of mining engineering, college of engineering, university of tehran, tehran, iran r. tavakkoli-moghaddam school of industrial engineering, college of engineering, university of tehran, tehran, iran lcfc, arts et métier paristech, centre de metz, france

open-pit production scheduling (opps) problem focuses on determining a block sequencing and scheduling to maximize net present value (npv) of the venture under constraints. the scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. in order to deal with the opps uncertainties, various approaches can be recommended. robust opti...

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

Journal: :journal of minimally invasive surgical sciences 0
michael w w carter department of mechanical and industrial engineering, university of toronto, canada saeedeh ketabi faculty of administrative sciences and economics, department of management, university of isfahan, ir iran +98-3117935239, [email protected]; faculty of administrative sciences and economics, department of management, university of isfahan, ir iran +98-3117935239, [email protected]

background operating room (or) planning involves the creation of a “master surgical schedule” in which surgeons are assigned to specific operating rooms (ors) on specific days of a week. the master schedule is typically one or two weeks long repeatable for several months. objectives the purpose of this study was to recommend using a mathematical program to generate a rotation in a way that the ...

Journal: :education policy analysis archives 1999

Journal: :IEEE Transactions on Parallel and Distributed Systems 1998

Journal: :Journal of Studies in Education 2014

2013
Donald E. Robertson

According to recent estimates, 36 percent of Virginia’s regular public high schools operate on a 4x4 block schedule and 41 percent operate on an A/B alternating day schedule. This brief provides an overview of both of these models, highlights the potential benefits and challenges of block scheduling, and summarizes the research base. To date, studies examining the impact of block scheduling on ...

Production scheduling in underground mines is still a manual process, and achieving a truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problems. Among the underground mining methods, sub-level caving is a common mining method with a high production rate for hard rock mining. There are limited studies about long-term production scheduling...