نتایج جستجو برای: blast vibration

تعداد نتایج: 72083  

Journal: :journal of mining and environment 2014
sujit kumar mandal n.k bhagat m.m singh

transmission of blast waves is a complex phenomenon and the characteristics vary with blast design parameters and geo-technical properties of medium. frequency of vibration and triggering component for structural excitation generally quantifies safe vibration magnitude. at closer distance or higher elevations than the blast locations, vertical or transverse component will be the first arrival t...

M.M Singh N.K Bhagat SUJIT MANDAL,

Transmission of blast waves is a complex phenomenon and the characteristics vary with blast design parameters and geo-technical properties of medium. Frequency of vibration and triggering component for structural excitation generally quantifies safe vibration magnitude. At closer distance or higher elevations than the blast locations, vertical or transverse component will be the first arrival t...

Journal: :journal of mining and environment 2015
h. mansouri m. a. ebrahimi farsangi

a linear superposition method was used for modeling the time history of the production blast vibrations and optimizing the blast sequence to reduce vibration levels in sar-cheshmeh copper mine, kerman, iran. a single-hole blast for modeling and two double-hole blasts with time delays of 25 and 65 ms between two holes for modeling validation were carried out. the generated vibrations were measur...

2016
Dong Wook Lee

Trial blasting is conducted to identify the characteristics of the blasting of the applicable ground before production blasting and to investigate various problems posed by blasting. The methods and pattern of production blasting are determined based on an analysis of the results of trial blasting. The bedrock in Jeju Island, South Korea is formed through the volcanic activities unlike the inla...

A linear superposition method was used for modeling the time history of the production blast vibrations and optimizing the blast sequence to reduce vibration levels in Sar-Cheshmeh copper mine, Kerman, Iran. A single-hole blast for modeling and two double-hole blasts with time delays of 25 and 65 ms between two holes for modeling validation were carried out. The generated vibrations were measur...

Journal: :Geophysical Prospecting 2023

Predicting the peak ground velocity (PGV) of vibrations is essential to blast mining operations in order design charge weights so as not exceed certain thresholds that prevent damage buildings and other infrastructure. The problem usually marred by a large scatter observed PGV due unknown complexities seismic wave propagation. Classic prediction methods employ empirical formulas, most widesprea...

Journal: :journal of mining and environment 2016
a. siamaki h. bakhshandeh amnieh

a considerable amount of energy is released in the form of shock wave from explosive charge detonation. shock wave energy is responsible for the creation of crushing and fracture zone around the blast hole. the rest of the shock wave energy is transferred to rock mass as ground vibration. ground vibration is conveyed to the adjacent structures by body and surface waves. geological structures li...

One of the factors affecting overbreak or slough of the roof and walls of underground stopes, causing unplanned dilution is blast vibration. The amount of damage caused by earth vibration can be measured in terms of peak particle velocity (PPV). In this study, in order to investigate the effects of blast vibration on the occurrence of unplanned dilution, 72 three-component records acquired upon...

Journal: :journal of mining and environment 0
m. ataei school of mining, petroleum & geophysics engineering, shahrood university of technology, shahrood, iran f. sereshki school of mining, petroleum & geophysics engineering, shahrood university of technology, shahrood, iran

like most limestone mines, which produce the raw materials required for cement companies, the transportation cost of the raw materials used in the shahrood cement company is high. it has been tried to build the crushing and grinding plant close to the mine as much as possible. on the other hand, blasting has harmful effects, and the impacts of blast-induced damages on the sensitive machinery, e...

1999

The drill & blast method is still the most typical method for medium to hard rock conditions. It can be applied to a wide range of rock conditions. Some of its features include versatile equipment, fast start-up and relatively low capital cost tied to the equipment. On the other hand, the cyclic nature of the drill & blast method requires good work site organization. Blast vibrations and noise ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید