نتایج جستجو برای: tardiness cost

تعداد نتایج: 388570  

2012
Milad Yousefi Rosnah Mohd Yusuff

Scheduling problems involving both earliness and tardiness costs became more important in recent years. This kind of problems include both earliness and tardiness penalties and tries to reduce them. In this study a case study from real world is investigated. Since the machine is bottle neck in the production line and all jobs have a common restrictive due date and different earliness and tardin...

2014
Hamed Fazlollahtabar Mohammad Saidi-Mehrabad

The objective of this paper is to propose a scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system. Considering the due date of AGVs requiring for material handling among shops in a job shop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Earliness results in AGVs waiting and tardine...

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

2005
DONGPING SONG C. HICKS C. F. EARL

This paper considers a stochastic assembly system operating on a make-to-order basis with complex product structure and resource constraints. The problem is to ® nd the optimal planned job release times by minimizing the expected sum of the work-in-progress holding cost, product earliness cost and product tardiness cost. A perturbation analysis algorithm is developed to derive the gradient esti...

2012
Ying Huang Xi Guo Wen Jing Hsu Wei Lin Lim

Two optimal algorithms, MTA* and MT-RBA*, are presented to find the optimal yard crane (YC) job sequence for serving a fleet of vehicles for delivery and pickup jobs with scheduled deadlines and predicted vehicle arrival times. The objective is to minimize the total tardiness of incoming vehicle jobs. This is important for minimizing vessel turnaround time. In the search for an optimal job sequ...

2012
Vikas S. Jadhav V. H. Bajaj

In this paper, we propose n-jobs to be processed on Single Machine Scheduling Problem (SMSP) involving fuzzy processing time and fuzzy due dates. The different due dates for each job be considered which meet the demand of customer with more satisfaction level. The main objective of this paper is the total penalty cost to be minimum in the schedule of the jobs on the single machine. This cost is...

Journal: :Mathematics 2023

In enterprise management, there are often multiple agents competing for the same products to reduce production cost. On this basis, paper investigates a two-agent slack due-date single-machine scheduling problem with deteriorating jobs, where processing time of job is extended as function position-dependent workload, resource allocation and common deterioration rate. The goal find optimal seque...

Journal: :European Journal of Operational Research 2003
Stefan Chanas Adam Kasperski

Two single machine scheduling problems with fuzzy processing times and fuzzy due dates are considered. In both we define the fuzzy tardiness of a job in a given sequence as a fuzzy maximum of zero and the difference between the fuzzy completion time and the fuzzy due date of this job. In the first problem we minimize the maximal expected value of a fuzzy tardiness and in the second we minimize ...

2013
Rodrigo A. Carrasco

Resource Cost Aware Scheduling Problems Rodrigo A. Carrasco Managing the consumption of non-renewable and/or limited resources has become an important issue in many different settings. In this dissertation we explore the topic of resource cost aware scheduling. Unlike the purely scheduling problems, in the resource cost aware setting we are not only interested in a scheduling performance metric...

2014
Hamed Fazlollahtabar Mohammad Saidi-Mehrabad

The objective of this paper is to propose a scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system. Considering the due date of AGVs requiring for material handling among shops in a job shop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Earliness results in AGVs waiting and tardine...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید