نتایج جستجو برای: steel box girder
تعداد نتایج: 167823 فیلتر نتایج به سال:
Non-destructive testing (NDI) techniques are routinely used in bridge inspection. However, detection accuracy, accessibility, cost and consequences of false indication are all factors to consider when selecting the NDI techniques to be used. A probabilistic method is proposed to help select the most suitable NDI technique and an associated optimal schedule for fracture-critical member/detail in...
The main girders of the I-section steel-concrete composite twin girder bridge is usually connected together by frame cross bracing. When with welding, flat plates for stiffening can be used to strengthen connection ensure effective transfer forces between two. In this paper, finite element simulation method study influence plates. results show that, compared structure without stiffening, when s...
Enhancing the ease of construction fillers and large-span floors their overall mechanical performance is critical for prefabricated hollow slabs in modular building structures. Therefore, we propose a novel assembly integral two-way floor structure (8.4 × 8.4 m) consisting permanent (BDF ribbed steel mesh box) three precast one-way hollow-core with I-shaped flexural sections to address above pr...
This report shows that safe extension of the service life of existing bridge structures is possible through bridge health monitoring and structural response modification. To understand bridge health monitoring and structural response modification and control, it is necessary to examine: 1) common bridge vulnerabilities, 2) bridge loading models, 3) response modification devices, and 4) bridge m...
Abstract In this study, a new transverse post-tensioning (TPT) technique for box girder bridges is investigated, where TPT applied at the top flange of resulting in eliminating in...
The segmental prestressed concrete box girder of Koror-Babeldaob (KB) Bridge in Palau, which had the record span of 241 m (791 ft.), presents a striking paradigm of serviceability loss due to excessive multi-decade deflections. The data required for analysis have recently been released and are here exploited to show how the analysis and design could be improved. Erected segmentally in 1977, thi...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید