Pull-out fracture of lag-screw bolt is brittle and has a large dispersion in strength. therefore, the bucking pipe preceding pull-out controls strength toughness joint. The sandwiched between bolts fixed to base plate. method little dispersion, can be controlled by adjusting thickness length effect was confirmed experiments. it also that once maximum load reached, restored exchanging pipe.