Scheduling on flexible flow shop with cost-related objective function considering outsourcing options
نویسندگان
چکیده مقاله:
This study considers outsourcing decisions in a flexible flow shop scheduling problem, in which each job can be processed by either an in-house production line or outsourced. The selected objective function aims to minimize the weighted sum of tardiness costs, in-house production costs, and outsourcing costs with respect to the jobs due date. The purpose of the problem is to select the jobs that must be processed in-house, schedule processing of the jobs in-house, and finally select and assign other jobs to the subcontractors. We develop a mixed-integer linear programming (MILP) model for the research problem. Regarding the complexity of the research problem, the MILP model cannot be used for large-scale problems. Therefore, four metaheuristic algorithms, including SA, GA, PSO, hybrid PSO-SA, are proposed to solve the problem. Furthermore, some random test problems with different sizes are generated to evaluate the effectiveness of the proposed MILP model and solution approaches. The obtained results demonstrate that the GA can obtain better solutions in comparison to the other algorithms.
منابع مشابه
Solving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...
متن کاملairside of airport capacity enhancement based on flexible flow shop multi-objective scheduling model
this research, for the first time presents the flexible flow shop model of scheduling method for considering runway assignment and operations planning together. one of the advantages of the developed model is considering the procedures of air routes in terminal airspace and separation between consecutive aircraft which is very similar to the real world condition. there are different objective f...
متن کاملBatch Scheduling in Flexible Flow Shop
In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...
متن کاملBatch Scheduling in Flexible Flow Shop
In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...
متن کاملSolving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Paretooptimal s...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 14 شماره 2
صفحات 69- 88
تاریخ انتشار 2021-07-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023