Project Risk Assessment Framework
نویسندگان
چکیده مقاله:
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. In the new proposed method, instead of using a purely qualitative method, Dempster-Shafer theory has been used because of the limited data for decision making. Finally, the proposed method is examined based on a construction company and the results are presented.
منابع مشابه
The Conceptual Framework for Construction Project Risk Assessment
The environment in which the project schedule will be executed is far from being static. Projects are subject to various uncertainties that have negative effect on activity durations. This is most apparent in the case of construction projects. The frequency and impact of risks depend on project-specific, contractor-specific and location-specific conditions. Identifying critical sources of risk ...
متن کاملA framework for ex ante project risk assessment based on absorptive capacity
This paper explores the applicability of the concepts of absorptive capacity and ‘‘ba’’ to ex ante project risk. We develop a hybrid framework to explain knowledge transfer based on these concepts—one that proposes a hybrid transference process. We then apply this framework to develop a methodology and metric for assessing ex ante software project risk, the risk that a new technology introduced...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملPower plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method
Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...
متن کاملProposed Framework for Security Risk Assessment
Security risk assessment framework provides comprehensive structure for security risk analysis that would help uncover systems’ threats and vulnerabilities. While security risk assessment is an important step in the security risk management process, this paper will focus only on the security risk assessment framework. Viewing issues that exist in a current framework, we have developed a new fra...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 2 شماره 1
صفحات 33- 44
تاریخ انتشار 2017-02-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023