Optimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time

نویسندگان

  • S. Bala
  • S. Sharma
چکیده مقاله:

One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs are not completely random, but bear a well defined relationship to one another to minimize the utilization time of machines and hence their rental cost under a specified rental policy. Further the processing times and independent set up times, each are associated with probabilities. A computer programme followed by a numerical illustration is given to validate the proposed algorithm. Keywords: Processing Time, Set Up Time, Specially Structured Flow Shop, Makespan, Utilization Time, Rental Cost.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Heuristic Approach for Specially Structured Two Stage Flow Shop Scheduling to Minimize the Rental Cost, Processing Time, Set Up Time Are Associated with Their Probabilities Including Transportation Time and Job Weightage

The present paper is an attempt to develop a new heuristic algorithm, find the optimal sequence to minimize the utilization time of the machines and hence their rental cost for two stage specially structured flow shop scheduling under specified rental policy in which processing times and set up time are associated with their respective probabilities including transportation time. Further jo...

متن کامل

Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...

متن کامل

On Specially Structured Two Stage Flow Shop Scheduling Problem with Setup Time Separated from Processing Time and Jobs in a String of Disjoint Job Blocks

This paper relates to two stage specially structured flow shop scheduling problem with jobs in a string of disjoint job blocks having sequence independent setup times separated from processing times each associated with their respective probabilities, where the optimization criteria is the utilization time of machines. To minimize the utilization time an algorithm is proposed and a numerical ex...

متن کامل

Minimization of Utilization Time for Two Stage Specially Structured Flow Shop Scheduling problem with Setup Time, Job Weightage and Jobs in a String of Disjoint Job Blocks

In this paper we study specially structured two stage flow shop scheduling problem with jobs in a string of disjoint job blocks having sequence independent setup times separated from processing times each associated with their respective probabilities including job weightage. In flow shop scheduling optimization of elapsed time may not always result in optimization of utilization time. Here, th...

متن کامل

Minimizing Rental Cost under Specified Rental Policy in Two Stage Open shop Scheduling Problem

This Paper is an attempt to study two stage open shop scheduling problem in which processing time of the jobs are given. The objective of the paper is to obtain an algorithm to minimize the rental cost of the machines in two stage open shop scheduling problem under specified rental policy. A numerical illustration is given to justify the proposed algorithm.

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 2  شماره None

صفحات  0- 0

تاریخ انتشار 2012-09

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023