This paper considers the problem of minimizing the mean tardiness of N jobs when the jobs are scheduled on a single machine. A simple algorithmic procedure is develop to obtain an optimal or a near optimal sequence for the N jobs while considering an equal penalty cost incurred to each job delivered later than its due date. The developed algorithm is applied to the several test problems. The results obtained reveals that the computational time and the required computer memory of the developed algorithm to provide a good solution are very low.
منابع مشابه
On Minimizing Total Tardiness in a Serial Batching Problem
We study the problem of scheduling jobs on a serial batching machine to minimize total tardiness. Jobs of the same batch start and are completed simultaneously and the length of a batch equals the sum of the processing times of its jobs. When a new batch starts, a constant setup time s occurs. This problem 1|s-batch| P Ti is known to be NP-Hard in the ordinary sense. In this paper we show that ...
متن کاملMinimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملMinimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem
This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...
متن کاملMinimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...
متن کاملMinimizing the total tardiness in a flexible job-shop
In this article, we consider the minimization of the total tardiness in a flexible job-shop. In our knowledge, this criterion is not previously studied for this type of shop configuration. The total tardiness criterion was mainly considered in the single machine problem (Chu [Chu92] and Souissi et al. [SKC04]). Few references studied this criterion in a job-shop configuration. The priority rule...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 3 شماره 3
صفحات 90- 97
تاریخ انتشار 1990-11-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023