Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop
نویسندگان
چکیده مقاله:
[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm to solve it optimally in a reasonable time. So, a branch-and-bound algorithm is proposed to find the optimal solution by means of dominance rules, upper and lower bounds. Several easy heuristic procedures are also proposed to derive near-optimal solutions. To evaluate the performance of the proposed algorithms, the computational experiments are extracted based on the recent literature. Deteriorating jobs lead to an increase in the makespan of the problems; therefore, it is important to obtain the optimal or near-optimal solution. Considering the complexity of the problem, the branch-and-bound algorithm is capable of solving problems of up to 26 jobs. Additionally, the average error percentage of heuristic algorithms is less than 1.37%; therefore, the best one is recommended to obtain a near-optimal solution for large-scale problems.
منابع مشابه
Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time
This paper considers a two-machine flow shop scheduling problem with deteriorating jobs in which the processing times of jobs are dependent on their starting times in the sequence. The objective is to minimize the weighted sum of makespan and total completion time. To analyse the problem, we propose a mixed integer programming model, and discuss several polynomially solvable special cases. We a...
متن کاملMakespan Minimization on Three-Machine Flow shop with deteriorating jobs
In this study, we consider a permutation flow shop scheduling problem on a three-machine with deteriorating jobs (a deteriorating job means that the job’s processing time is an increasing function of its starting time) so as to minimize the makespan. We model job deterioration as a function that is proportional to a linear function of time. For some special cases, we prove that the problem can ...
متن کاملTwo machine Flow shop with transportation time
We present a scheduling problem of the flow-shop type. We introduce a transportation system: robot or conveyor. This transportation system is also involved in machine loading and unloading. The studied workshop consists of two machines and a conveyor that must process a set of tasks. Tasks having just been executed wait for the conveyor to be transported. The objective is to determine a feasibl...
متن کاملMinimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملInvestigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices
In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...
متن کاملLower bounds for minimizing total completion time in a two-machine flow shop
For the NP-hard problem of scheduling n jobs in a two-machine flow shop so as to minimize the total completion time, we present two equivalent lower bounds that are computable in polynomial time. We formulate the problem by the use of positional completion time variables, which results in two integer linear programming formulations with O(n2) variables and O(n) constraints. Solving the linear p...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 29 شماره 6
صفحات 778- 787
تاریخ انتشار 2016-06-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023