Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

نویسندگان

  • Mehdi Heydari Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran.
چکیده مقاله:

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional idle time is permitted. A mixed integer linear programming is formulated to determine the timing of jobs in order to minimize total energy costs while idle time insertion is allowed. For the non-delay version of the problem, a branch-and-bound algorithm is presented. A lower bound and several dominance properties are used to increase the speed of the branch-and-bound algorithm. Computational experiments are also given to evaluate the performance of the algorithm. Based on results, the proposed algorithms can optimally schedule jobs in small size samples but by increasing the number of jobs from 15 and cost periods from 3, the performance of branch-and-bound has been decreased.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time

One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs a...

متن کامل

Inverse scheduling: two-machine flow-shop problem

We study an inverse counterpart of the two machine flow-shop scheduling problem that arises in the context of inverse optimization. While in the forward scheduling problem all parameters are given and the objective is to find job sequence(s) for which the value of the makespan is minimum, in the inverse scheduling the exact values of processing times are unknown and they should be selected with...

متن کامل

Scheduling to minimize energy and flow time in broadcast scheduling

In this paper, we initiate the study of minimizing power consumption in the broadcast scheduling model. In this setting, there is a wireless transmitter. Over time requests arrive at the transmitter for pages of information. Multiple requests may be for the same page. When a page is transmitted, all requests for that page receive the transmission simultaneously. The speed the transmitter sends ...

متن کامل

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria

In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 5  شماره 2

صفحات  97- 112

تاریخ انتشار 2018-12-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023