Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability
نویسندگان
چکیده مقاله:
In this paper, an integrated machine scheduling withits due date setting problem has been considered. It is assumed that the machine is subject to some kind of random unavailability. Due dates should be set in an attractive and reliable manner, implying that they should be short and possible to be met. To this end, first, long due dates are penalized in the objective function. Then, for each customer order, the probability of meeting his/her promised due dateis forced to be at least as large as his/her required service level. To handle this integrated problem, first, the optimal due date formulafor any arbitrary sequence is derived. By using this formula, the mathematical programming formulation of the problem,including a nonlinear non-convex expression, is developed. By defining a piecewise linear under-estimator, the solutions of the resultantmixed integer linear programming formulation have become the lower bounds of the problem. Dynasearch is a very efficient heuristic utilizing the dynamic programming approach to search exponential neighborhoods in the polynomial time. Aniterated dynasearch heuristic is developed for the sequencing part of the problem. Each generated sequence is evaluated by computing its optimal due datesusing the above-mentioned formula. Numerical results confirmed the high quality of the solutions found by this algorithm, as compared with the lower bound.
منابع مشابه
Single-Machine Common Due Date Total Earliness/Tardiness Scheduling with Machine Unavailability
Research on non-regular performance measures is at best scarce in the deterministic machine scheduling literature with machine unavailability constraints. Moreover, almost all existing works in this area assume either that processing on jobs interrupted by an interval of machine unavailability may be resumed without any additional setup/processing or that all prior processing is lost. In this w...
متن کاملStochastic Single Machine Scheduling with Random Common Due Date
This paper studies the single machine scheduling problem for minimizing the expected total weighted deviations of completion times from random common due date. Jobs have exponentially distributed processing times and the common due date is a generalized Erlang distribution. The optimal schedules are shown to be ⁄-shaped. Moreover, we give the optimal schedules when the machine is subject to sto...
متن کاملScheduling Jobs and a Variable Maintenance on a Single Machine with Common Due-Date Assignment
We investigate a common due-date assignment scheduling problem with a variable maintenance on a single machine. The goal is to minimize the total earliness, tardiness, and due-date cost. We derive some properties on an optimal solution for our problem. For a special case with identical jobs we propose an optimal polynomial time algorithm followed by a numerical example.
متن کاملBatch Scheduling and Common Due-date Assignment on a Single Machine
We consider the problem of scheduling n groups of jobs on a single machine where three types of decisions are combined: scheduling, batching and due-date assignment. Each group includes identical jobs and may be split into batches; jobs within each batch are processed jointly. A sequence independent machine set-up time is needed between each two consecutively scheduled batches of different grou...
متن کاملA note on due-date assignment and single-machine scheduling with deteriorating jobs
We study a scheduling problem with deteriorating jobs, i.e., jobs whose processing times are an increasing function of their start times. We consider the case of a single machine and linear job-independent deterioration. The problem is to determine an optimal combination of the due date and schedule so as to minimize the sum of due-date, earliness and tardiness penalties. We give an O(n logn) t...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 12 شماره 1
صفحات 1- 13
تاریخ انتشار 2019-03-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023