Improving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment

نویسندگان

چکیده مقاله:

Drum–Buffer–Rope is a theory of constraints production planning methodology that operates by developing a schedule for the system’s first bottleneck. The first bottleneck is the bottleneck with the highest utilization. In the theory of constraints, any job that is not processed at the first bottleneck is referred to as a free good. Free goods do not use capacity at the first bottleneck, so very little attention is given to them in the Drum–Buffer–Rope literature. The objective of this paper is to present a methodology that improves the Drum–Buffer–Rope material flow management with attention to the second bottleneck and free goods. This paper presents a comparative analysis of Drum–Buffer–Rope material flow management and the proposed methodology in a job shop environment. To study the impact of free goods and the second bottleneck on the performance of the DBR method, 18 job shop simulation models were developed and data analysis was done for each simulation model. Lead time and throughput are the system performance measurement output parameters. The simulation result shows that the proposed methodology significantly improved the lead time and throughput.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop

This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...

متن کامل

A Particle Swarm Optimization Approach to Joint Location and Scheduling Decisions in A Flexible Job Shop Environment

In traditional scheduling literature, it is generally assumed that the location of facilities are predetermined and fixed in advance. However, these decisions are interrelated and may impact each other significantly. Therefore finding a schedule and facility location has become an important problem as an extension of the well-known scheduling problems. In this research we consider joint decisio...

متن کامل

a comparison of teachers and supervisors, with respect to teacher efficacy and reflection

supervisors play an undeniable role in training teachers, before starting their professional experience by preparing them, at the initial years of their teaching by checking their work within the proper framework, and later on during their teaching by assessing their progress. but surprisingly, exploring their attributes, professional demands, and qualifications has remained a neglected theme i...

15 صفحه اول

Mathematical Models of Flow Shop and Job Shop Scheduling Problems

In this paper, mathematical models for permutation flow shop scheduling and job shop scheduling problems are proposed. The first problem is based on a mixed integer programming model. As the problem is NP-complete, this model can only be used for smaller instances where an optimal solution can be computed. For large instances, another model is proposed which is suitable for solving the problem ...

متن کامل

passivity in waiting for godot and endgame: a psychoanalytic reading

this study intends to investigate samuel beckett’s waiting for godot and endgame under the lacanian psychoanalysis. it begins by explaining the most important concepts of lacanian psychoanalysis. the beckettian characters are studied regarding their state of unconscious, and not the state of consciousness as is common in most beckett studies. according to lacan, language plays the sole role in ...

Two Machines Flow Shop Scheduling with Single Transport Facility and Job-Block Criteria under Fuzzy Environment

This paper pertains to a two machine flowshop scheduling involving independent setup time, transportation time and job block criteria in fuzzy environment. Further, a single transporting agent which carries the jobs from one machine to another is also considered. The objective of the paper is to minimize the makespan, idle time of the machines whenever the processing time, setup time each are u...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 2  شماره 1

صفحات  77- 88

تاریخ انتشار 2017-06-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023