Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

نویسندگان

  • Mohammad Asghari MSc, Department of Industrial Engineering, Ferdowsi University of Mashhad, PO Box 91775-1111, Azadi Sq., Mashhad, Iran
  • Samaneh Nezhadali MSc, Department of Management, Iran Chamber of Commerce, Industries and Mines, Mashhad, Iran
چکیده مقاله:

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for appraising a multi-objective programing that minimize total weighted tardiness, earliness and total flowtime with fuzzy parameters on parallel machines, simultaneously with respect to the impact of machine deterioration. Besides, in this paper attempted to present a defuzzification approach and a heuristic method based on genetic algorithm (GA) to solve the proposed model. Finally, several dominant properties of optimal solutions are demonstrated in comparison with the results of a state-of-the-art commercial solver and the simulated annealing method that is followed by illustrating some instances for indicating validity and efficiency of the method.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

fuzzy programming for parallel machines scheduling: minimizing weighted tardiness/earliness and flow time through genetic algorithm

appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. one type of scheduling problems is just-in-time (jit) scheduling and in this area, motivated by jit manufacturing, this study investigates a mathematical model for...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flowtime through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters with it, this is why in recent decades extensive researches have been done on scheduling issues. A type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical ...

متن کامل

A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm

This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...

متن کامل

Electromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and ‎tardiness‎

‎In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...

متن کامل

Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness

Abstract: This paper considers a bi-criteria scheduling on parallel machines in fuzzy environment which optimizes the weighted flow time and maximum tardiness. The fuzziness, vagueness or uncertainty in processing time of jobs is represented by triangular fuzzy membership function. The bi-criteria problem with weighted flow time and maximum tardiness as primary and secondary criteria, respectiv...

متن کامل

electromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and ‎tardiness‎

‎in this paper, we study a flow shop batch processing machines scheduling problem. the fuzzy due dates are considered to make the problem more close to the reality. the objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. in order to tackle the given problem, we propose a hybrid electromagnetism-like (em) algorithm, in which the em is hybridized with a diversi...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 7  شماره 14

صفحات  61- 73

تاریخ انتشار 2014-03-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.