Determining Maintenance Opportunity Window (MOW) in Job-Shop Systems by Considering Manpower of Maintenance

نویسندگان

  • Alireza nikoubin School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
  • Fariborz Jolai School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
  • mahdi mokhtarzadeh School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
چکیده مقاله:

Nowadays, production systems seek to integrate production and maintenance activities. An effective maintenance plan can improve maintenance stability and system performance. Machines that stop for repairing operation impose a high cost on the system. On the other hand, there are always some intangible situations during a production process in which repairing activities can be carried out. If they are detected, system productivity can be improved. The main purpose of this study is specifying Maintenance Opportunity Window (MOW) in job-shop production systems. For this purpose, mathematical models and formulae were developed in order to determine the MOW in a way that they could provide maximum repairing time for the machine and, as a result, the lowest disturbance occurring in production. This model also determines the number of lost products during PM. Considering the manpower of maintenance and M/M/1//k queueing model, the terms required for repairs are addressed. Finally, numerical experiments on and sensitivity analysis of critical parameters of the model, such as the initial level of the buffers and processing rates of the machines, are considered. Model validation is carried out by comparison of the results with a simulation model. In this study, some suggestions for improving the system are proposed.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling of Flexible Manufacturing Systems Considering Maintenance

Scheduling of flexible manufacturing systems is one of problems in NP-Hard optimization. The aim of scheduling of these systems is to maximize the system efficiency by finding an optimal planning for a better cooperation among various processes. In recent years many algorithms proposed to solve this problem, and most of them are based on heuristic methods. In This paper we have proposed a new a...

متن کامل

Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...

متن کامل

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...

متن کامل

Airline short-term maintenance manpower supply planning

It is essential that airlines efficiently perform aircraft maintenance in order to ensure aviation safety and schedule punctuality. Traditionally, the arrangement of the maintenance manpower supply has been based on staff experience, and has been performed manually following simple rules. This is not only time-consuming but often ineffective. In this research we consider technicians with multip...

متن کامل

Study and application of Reliability-centered Maintenance considering Radical Maintenance

Radical Maintenance (RM) takes the root causes of failures as executive objects to make maintenance decisions. A Root Cause Analysis (RCA) is carried out on the function failure of equipment to performRMand to create a maintenance plan using the combined methods of Failure Mode, Effects and Criticality Analysis (FMECA), and Fault Tree Analysis (FTA). Evaluation criteria andmatrixes of criticali...

متن کامل

Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability

Scheduling for the flexible job shop is very important in the fields of production management and combinatorial optimization. However, it is quite difficult to achieve an optimal solution to this problem in medium and actual size problems with traditional optimization approaches owing to the high computational complexity. In this paper, dynamic scheduling in flexible job shop is considered. The...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 4  شماره 1

صفحات  41- 54

تاریخ انتشار 2019-06-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023