Bicriteria Resource Allocation Problem in Pert Networks
نویسندگان
چکیده مقاله:
We develop a bicriteria model for the resource allocation problem in PERT networks, in which the total direct costs of the project as the first objective, and the mean of project completion time as the second objective are minimized. The activity durations are assumed to be independent random variables with either exponential or Erlang distributions, in which the mean of each activity duration is a non-increasing function of the amount of resource allocated to it. The direct cost of each activity is assumed to be a non-decreasing function of the amount of resource allocated to it. Finally, we use the goal attainment method to solve the related bicriteria optimal control problem numerically, by converting this problem to a related bicriteria nonlinear programming, and obtain the optimal values of the resources allocated to the activities.
منابع مشابه
A multi-objective resource allocation problem in PERT networks
We develop a multi-objective model for resource allocation problem in PERT networks with exponentially or Erlang distributed activity durations, where the mean duration of each activity is a non-increasing function and the direct cost of each activity is a non-decreasing function of the amount of resource allocated to it. The decision variables of the model are the allocated resource quantities...
متن کاملA multi-objective resource allocation problem in dynamic PERT networks
We develop a multi-objective model for the resource allocation problem in a dynamic PERT network, where the activity durations are exponentially distributed random variables and the new projects are generated according to a Poisson process. This dynamic PERT network is represented as a network of queues, where the service times represent the durations of the corresponding activities and the arr...
متن کاملA Multi Objective Fibonacci Search Based Algorithm for Resource Allocation in PERT Networks
The problem we investigate deals with the optimal assignment of resources to the activities of a stochastic project network. We seek to minimize the expected cost of the project include sum of resource utilization costs and lateness costs. We assume that the work content required by the activities follows an exponential distribution. The decision variables of the model are the allocated resourc...
متن کاملA heuristic method for consumable resource allocation in multi-class dynamic PERT networks
This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different arrival rates. Each activity of any project is operated at a devoted service station located in a n...
متن کاملResource allocation in dynamic PERT networks with finite capacity
Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran Michael Smurfit Graduate School of Business, University College Dublin, Dublin, Ireland Department of Industrial Engineering, Faculty of Engineering, University of Tehran, Tehran, Iran Department of Financial Engineering and Engineering Management, School of Science and Engineering, Reykjavik Universit...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 17 شماره 2
صفحات 157- 168
تاریخ انتشار 2004-06-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023