A risk adjusted self-starting Bernoulli CUSUM control chart with dynamic probability control limits

نویسندگان

  • Fatemeh Sogandi Ph.D. Student, Department of Industrial Engineering, Amirkabir University of Technology
  • Majid Aminnayeri Associate Professor, Department of Industrial Engineering, Amirkabir University of Technology
چکیده مقاله:

Usually, in monitoring schemes the nominal value of the process parameter is assumed known. However, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. On the other hand, applying a fixed control limit for the risk-adjusted Bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar risk score distributions in monitoring clinical and surgical performance. To solve these problems, a self-starting scheme is proposed based on a parametric bootstrap method and dynamic probability control limits for the risk-adjusted Bernoulli cumulative sum control charts. The advantage of the proposed control charts lies in the use of probability control limits when any assumptions about the patients’ risk distributions and process parameter. Simulation studies show that both proposed schemes have good performance under various shifts.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

a risk adjusted self-starting bernoulli cusum control chart with dynamic probability control limits

usually, in monitoring schemes the nominal value of the process parameter is assumed known. however, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. on the other hand, applying a fixed control limit for the risk-adjusted bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar...

متن کامل

A Risk-Adjusted Self-Starting Bernoulli CUSUM Control Chart with Dynamic Probability Control Limits

103 AIJ Modeling, Identification, Simulation and Control, Vol 48, No. 2, Fall 2016 Please cite this article using: Aminnayeri, M., and Sogandi, F., 2016. “A Risk-Adjusted Self-Starting Bernoulli CUSUM Control Chart with Dynamic Probability Control Limits”. Amirkabir International Journal of Modeling, Identification, Simulation and Control, 48(2), pp. 103–110. DOI: 10.22060/miscj.2016.833 URL: h...

متن کامل

A two-sided Bernoulli-based CUSUM control chart with autocorrelated observations

Usually, in monitoring a proportion p < /em>, the binary observations are considered independent; however, in many real cases, there is a continuous stream of autocorrelated binary observations in which a two-state Markov chain model is applied with first-order dependence. On the other hand, the Bernoulli CUSUM control chart which is not robust to autocorrelation can be applied two-sided co...

متن کامل

The Effect of Estimation Error on Risk-adjusted Bernoulli GEWMA Control Chart in Multistage Healthcare Processes

Background and objectives: Risk-adjusted Bernoulli control chart is one of the main tools for monitoring multistage healthcare processes to achieve higher performance and effectiveness in healthcare settings. Using parameter estimates can lead to significantly deteriorate chart performance. However, so far, the effect of estimation error on this chart in which healthcare ...

متن کامل

A Self-starting Control Chart for Simultaneous Monitoring of Mean and Variance of Simple Linear Profiles

In many processes in real practice at the start-up stages the process parameters are not known a priori and there are no initial samples or data for executing Phase I monitoring and estimating the process parameters. In addition, the practitioners are interested in using one control chart instead of two or more for monitoring location and variability of processes. In this paper, we consider a s...

متن کامل

Exponential CUSUM Charts with Estimated Control Limits

Exponential CUSUM charts are used in monitoring the occurrence rate of rare events because the interarrival times of events for homogeneous Poisson processes are independent and identically distributed exponential random variables. In these applications, it is assumed that the exponential parameter, i.e. the mean, is known or has been accurately estimated. However, in practice, the in-control m...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 48  شماره 2

صفحات  103- 110

تاریخ انتشار 2016-11-21

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023