A Numerical Investigation of TBM Disc Cutter Life Prediction in Hard Rocks
نویسندگان
چکیده مقاله:
There is a direct relationship between the efficiency of mechanized excavation in hard rocks and that of disc cutters. Disc cutter wear is an important effective factor involved in the functionality of tunnel boring machines. Replacement of disc cutters is a time-consuming and costly activity that can significantly reduce the TBM utilization and advance rate, and has a major effect on the total time and cost of the tunneling projects. When these machines bore through hard rocks, the cutter wear considerably affects the excavation process. To evaluate the performance of the cutters, first, it is essential to figure out how they operate the rock cutting mechanism; secondly, it is important to identify the key factors that cause the wear. In this work, we attempt to introduce a comprehensive numerical method for estimation of disc cutter wear. The field data including the actual cutter wear more than 1000 pieces and the geological parameters along the Kani-Sib transmission tunnel in the northwest of Iran are compiled in a special database that is subjected to a statistical analysis in order to reveal the genuine wear rule. The results obtained from the numerical method indicate that with an increase in the wear of disk cutter up to 25 mm, the applied normal and rolling forces can be multiplied by 2.9 and 2.7, respectively, and by passing the critical wear, the disk cutters lose their optimal performance. This method also shows that confining pressure will increase the wear of the disc cutter. By the proposed formulation, the cutter consumption rate can be predicted with a high accuracy.
منابع مشابه
Numerical Analysis of Dynamic Response Mechanism of Rock by TBM Disc Cutter
The dynamic response mechanism of the rock fragmentation and its influential factors by TBM disc cutter are studied in this paper. Firstly, a dynamic response model is established based on the fracture mechanics and finite element theory. Secondly, a fragmentation rule is founded according to the dynamic response model, and then numerical simulations for dynamic response of rock are carried out...
متن کاملHeat Conduction Model of TBM Disc Cutter Cutting Temperature and Its Solution
Disc cutter is Full face rock tunnel boring machine (TBM) important rock breaking tool, cutting heat generation has an important influence on cutter life, disc cutter cutting temperature characteristic research be imperative. Based on heat conduction theory to establish disc cutter cutting temperature heat conduction model, and derive its solution; analyze influence on disc cutter cutting tempe...
متن کاملExperimental Investigation and Numerical Prediction of Fatigue Life in Force Fitted Fastener Holes
In this paper, the effect of interference fit on fatigue life of holed plate of mechanical joints was investigated experimentally. Fatigue tests were carried out on the holed specimens of Al-alloy 7075-T6 alloy. The interference fit process consists of force fitting a fastener into the hole with a negative clearance (diameter of the fastener is larger than of the hole) that produces beneficial ...
متن کاملsecuritization of mortality risks in life annuities
insurers have in the past few decades faced longevity risks - the risk that annuitants survive more than expected - and therefore need a new approach to manage this new risk. in this dissertation we survey methods that hedge longevity risks. these methods use securitization to manage risk, so using modern financial and insurance pricing models, especially wang transform and actuarial concepts, ...
15 صفحه اولa time-series analysis of the demand for life insurance in iran
با توجه به تجزیه و تحلیل داده ها ما دریافتیم که سطح درامد و تعداد نمایندگیها باتقاضای بیمه عمر رابطه مستقیم دارند و نرخ بهره و بار تکفل با تقاضای بیمه عمر رابطه عکس دارند
Recent Developments in Site Investigation and Testing for Hard Rock Tbm Projects
For several recent TBM tunnel projects, unexpected ground conditions have been encountered, causing extra cost, considerable delay, and in some cases major claims. Undoubtedly, insufficient and/or irrelevant site investigation and testing are among the main causes of such incidents. The purpose of this paper is to review the main investigations and tests relevant for hard rock TBM projects, wit...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 11 شماره 4
صفحات 1095- 1113
تاریخ انتشار 2020-10-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023