A New model for integrated lot sizing and scheduling in flexible job shop problem

نویسندگان

چکیده مقاله:

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and Scheduling Problems (PLSP), is proposed to formulate the problem. Since the problem under study is NP-hard, a modified harmony search algorithm, with a new built-in local search heuristic is proposed as solution technique.In this algorithm,it is improvised a New Harmony vector in two phases to enhance search ability.Additionally, Taguchi method is used to calibrate the parameters of the modified harmony search algorithm. Finally, comparative results demonstrate the effectiveness of the modified harmony search algorithm in solving the problem.It is also demonstrated that the proposed algorithm can find good quality solutions for all size problems. The objective values obtained by proposed algorithm are better from HS algorithm and exact method results.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy job shop scheduling with lot-sizing

This paper deals with a problem of determining lot-sizes of jobs in a real-world job shop-scheduling in the presence of uncertainty. The main issue discussed in this paper is lot-sizing of jobs. A fuzzy rule-based system is developed which determines the size of lots using the following premise variables: size of the job, the static slack of the job, workload on the shop floor, and the priority...

متن کامل

Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

متن کامل

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

Flexible job shop scheduling under availability constraints

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

متن کامل

Single Objective Evolutionary Algorithm for Flexible Job-shop Scheduling Problem

A meta-heuristic approach for solving the flexible job-shop scheduling problem (FJSP) is presented in this study. This problem consists of two sub-problems, the routing problem and the sequencing problem and is among the hardest combinatorial optimization problems. We propose a Evolutionary Algorithm (EA) for the FJSP. Our algorithm uses several different rules for generating the initial popula...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 10  شماره 3

صفحات  72- 91

تاریخ انتشار 2017-09-22

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023