A new algorithm for optimum open pit design: Floating cone method III

نویسندگان

  • amir yusefi member of technicaloffice, eastern Alborz coal company
  • Reza Kakaie professor of Faculty of Mining Engineering & Geophysics, Shahrood University of Technology, Shahrood
چکیده مقاله:

Ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. A number of algorithms such as floating or moving cone method, floating cone method II and the corrected forms of this method, the Korobov algorithm and the corrected form of this method, dynamic programming and the Lerchs and Grossmann algorithm based on graph theory have been developed to find out the optimum final pit limits. Each of these methods has special advantages and disadvantages. Among these methods, the floating cone method is the simplest and fastest technique to determine optimum ultimate pit limits to which variable slope angle can be easily applied. In contrast, this method fails to find out optimum final pit limits for all the cases. Therefore, other techniques such as floating cone method II and the corrected forms of this method have been developed to overcome this shortcoming. Nevertheless, these methods are not always able to yield the true optimum pit. To overcome this problem, in this paper a new algorithm called floating cone method III has been introduced to determine optimum ultimate pit limits. The results show that this method is able to produce good outcome.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

a new algorithm for optimum open pit design: floating cone method iii

ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. a number of algorithms such as floating or moving cone method, floating cone method ii and the corrected forms of this method, the korobov algorithm and the corrected form of this method, dynamic programming and the lerchs and grossmann algorithm based on grap...

متن کامل

طراحی محدودة بهینه نهایی در معادن روباز با روش‌های اصلاح شدة مخروط شناور دو

With the advent and wide spread use of computers a number of algorithms have been developed to determine the optimum ultimate pit limits in open pit mining. The main objective of these algorithms is to find groups of blocks that should be removed to yield the maximum overall mining profit under specified economic conditions and technological constraints. The most common methods are: Lerchs and ...

متن کامل

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

A new algorithm for the open-pit mine scheduling problem

For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...

متن کامل

Open pit limit optimization using dijkstra’s algorithm

In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...

متن کامل

A New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure

One of the most important issues in all stages of mining study is capital cost estimation. Determination of capital expenditure is a challenging issue for mine designers. In recent decade, quite a few number of studies have focused on proposing estimation models to predict mining capital cost. However, these efforts have not achieved to a predictor model with reliable range of error. Both of ov...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 2  شماره 2

صفحات  118- 125

تاریخ انتشار 2012-09-09

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023