A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

نویسندگان

چکیده مقاله:

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, the amount of continuous crashing, and a start time for each activity so that all constraints are obeyed and the project duration is minimized. Project scheduling of this type occurs in many fields for instance, predicting the resources and duration of activities in software development projects. A key feature of the model is that none of the typical models can cope with the continuous resource constraints. Computational results with a set of 100 generated instances have been reported and the efficiency of the proposed model has been analyzed.  

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

Adaptive Genetic Algorithms for Multi-resource Constrained Project Scheduling Problem with Multiple Modes

In modern manufacturing systems like multi-resource constrained project scheduling problem with the multiple modes (mcPSP-mM) is complicated because of the complex interrelationships between the units of the different stages. In this paper, we develop an adaptive genetic algorithm (aGA) to solve the mcPSP-mM which is a well known NP-hard problem. A new aGA algorithm approach for solving these m...

متن کامل

Resource-Constrained Project Scheduling with Genetic Algorithm

The purpose of this paper presents a heuristic method based in genetic algorithms (GA) for resource-constrained project scheduling. The problem studied was of the scheduling of projects that share the same pool of resources. This situation is very common in some environments of project, i. e., construction P&D units. Fluctuation in resource usage can result in many problems, such as the need in...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 18  شماره 3

صفحات  7- 18

تاریخ انتشار 2007-11

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023