4D geomechanical simulations for field development planning

نویسنده

چکیده مقاله:

3D and 4D geomechanical can be time-consuming to build and calibrate. However, once such a model is built, it is relative straightforward to use this model for various field development and management applications. In so doing, the return on the initial investment of time and effort in the creation of a 4D geomechanical model can be substantial. I present a case study where a 4D geomechanical model of a deepwater turbidite field under water flood is used to: Assessment of wellbore stability for drilling inclined infill wells after a stuck pipe event  Calculation of maximum allowable injection pressures during hydraulic stimulation to avoid out-of-zone growth of stimulated fractures, and evaluation of risk of fault re-activation during a range of production scenarios for pressure support in order to establish safe operational limits for pressure support. Model building uses seismic inversion volumes to constrain a geological facies model, followed by upscaling to a reservoir simulation model and history matching. Similarly, a 3D geomechanical property model is built to the seafloor. The calibration of the pre-production stress state of the geomechanical model comprises of matching the results of 3D finite element stress field calculations to 1D wellbore models. The calibration uses a novel method of linking tectonic strain terms in poro-elastic equations in the 1D and 3D models. Production and injection processes are the computed using a fully coupled finite element based geomechanical flow simulator, solving multi-phase (black-oil) fluid flow and geomechanics equations simultaneously on the same computational mesh. The computational mesh is optimized for geomechanical predictions of wellbore and fault stability.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

4D treatment (planning) workshop

no 1: Technical challenges of fast volumetric rescanning O. Actis, D. Meer, A. Mayor, G. Klimpki, S. Psoroulas, D.C. Weber For pencil beam scanning the most studied method to mitigate the dose delivery uncertainties due to the organ motion is rescanning. Achieving an optimal treatment for a moving target by volumetric rescanning, where the whole tumour volume is scanned multiple times, requires...

متن کامل

4d Construction Planning

Linear, 2-Dimensional and now 3-Dimensional visualization are the current tools used in the construction planning area. It is time for a new dimension to be added the dimension in which Planning Engineers are more interested. The dimension is TIME, which is now appropriate to add as the 4th dimension in construction planning. Current planning processes in the construction industry are still mai...

متن کامل

4D Treatment Planning Implementations for TRiP98

TRiP98 is a treatment planning program for heavy ion radiotherapy[1] with a scanned ion beam and was developed at GSI[2]. It has been successfully used in clinical routine from 1997-2008 for over 400 patients, predominantly with head and neck tumors[3]. The treatment of mobile tumors, such as lung tumors, with a scanned ion beam poses additional challenges, resulting into a higher complexity of...

متن کامل

4D treatment planning for scanned ion beams

At Gesellschaft für Schwerionenforschung (GSI) more than 330 patients have been treated with scanned carbon ion beams in a pilot project. To date, only stationary tumors have been treated. In the presence of motion, scanned ion beam therapy is not yet possible because of interplay effects between scanned beam and target motion which can cause severe mis-dosage. We have started a project to trea...

متن کامل

4D Simulation and Construction Planning

Students will learn how to use a workflow combining models created with the Autodesk® Revit platform with the Autodesk Navisworks® TimeLiner tool to create 4D simulations of planned construction processes. They will explore modeling techniques for creating better and more accurate simulations, as well as the importance of modeling building elements to reflect planned construction techniques. Th...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 3  شماره شماره 1 (شماره ویژه انگلیسی)

صفحات  34- 44

تاریخ انتشار 2019-05-22

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023