ارزیابی ریسک و تعیین شاخص‌های عملکرد ایمنی در مرحله طراحی و ساخت پروژه آگلومراسیون، سال 1390

نویسندگان

  • حلوانی, غلامحسین دانشگاه علوم پزشکی و خدمات بهداشتی درمانی شهید صدوقی یزد
  • ذوالعلی, فرزانه دانشگاه علوم پزشکی و خدمات بهداشتی درمانی کرمان
  • مقدسی, مجتبی سنگ آهن مرکزی ایران، بافق
  • هاشمی نژاد, ناصر دانشگاه علوم پزشکی و خدمات بهداشتی درمانی کرمان
چکیده مقاله:

Background: To reduce accidents, industrial HSE management system, and based on”prevention before occurrence” is required. The aim of this study was to evaluate the safety conflicts by Preliminary Hazard Analysis (PHA) method, and determine the relationship between risk assessment and accident indicators. Methods: This is a descriptive analytical- study on 30 jobs in the Agglomeration Constructing Project in Bafgh. After classify risks, severity and probability of the risks determined, and the Initial Risk Assessment Code (RAC1) were computed. The corrective actions were recorded, and then the Secondary Risk Assessment Code (RAC2) was determined. Annual safety performance indicators were also calculated and statistical analysis conducted on the relationship between these indicators and the results of risk assessment. Results: The highest accident frequency rate and the highest risk job were welding jobs. Maximum lost work days were in steel construction. Also there was a significant difference between risk assessment before and after corrective action that is indicative for the effectiveness of corrective actions. In the next step for determining the relationship between the initial risk assessment codes (RAC1) and safety performance indicators (AFR, ASR and FSI), Pearson correlation coefficient was showed an inverse and quite significant relationship between RAC1 and safety performance indicators. Linear regression equation showed that for every one unit increase in RAC1, the AFR, ASR and FSI, was reduced 14.9, 110.37 and 1.24 respectively. Conclusion: Due to high rate of accidents and risks, faster investigation about safety conflicts and elimination of them is needed.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

طراحی سیستم پشتیبانی تصمیم مدل‌محور براییکپارچه‌سازی ارزیابی عملکرد پروژه و مدیریت ریسک(پروژه‌های سرمایه‌گذاری ساخت)

امروزه فضای پیچیده و پرابهام صنعت ساخت، عوامل فعال را ناگزیر به بهره‌گیری از ابزارهای نوین مدیریت پروژه و دانش روز دنیا می‌کند. این عوامل به‌دلیل گستره‌ی پهناور این دانش، بیشتر بر حوزه‌های کلیدی گریزناپذیر متمرکزند که این خود ضامن موفقیت‌های بیشتر خواهد بود. با هدف پاسخ‌گویی به نیازهای مذکور، مدل یکپارچه‌یی از ارزیابی عملکرد و آنالیز ریسک، در قالب یک سیستم پشتیبانی تصمیم مدل‌محور و با هدف افزای...

متن کامل

ارزیابی ریسک های ایمنی بر اساس منطق فازی در پروژه های ساخت مترو

Introduction: Organizations, manufacturing and non-manufacturing companies, and development units are always associated with incidents and the need for proper risk assessment. One of these is the process of constructing subwayways that, given its nature, require special attention and the occurrence of accidents is always there. But as risk definition is clear, risk is always associated with unc...

متن کامل

Degenerate Four Wave Mixing in Photonic Crystal Fibers

In this study, Four Wave Mixing (FWM) characteristics in photonic crystal fibers are investigated. The effect of channel spacing, phase mismatching, and fiber length on FWM efficiency have been studied. The variation of idler frequency which obtained by this technique with pumping and signal wavelengths has been discussed. The effect of fiber dispersion has been taken into account; we obtain th...

متن کامل

تعیین شاخصهای ارزیابی عملکرد قطبهای علمی

آموزش عالی معرف نوع مهمی از سرمایه‌گذاری در منابع انسانی است که با فراهم‌آوری و ارتقای دانش، فناوری، خلاقیت و مهارت و نگرش موردنیاز فراگیران، به توسعه پایدار کمک می‌کند. آموزش عالی موجب ترویج دانش می‌شود و با پژوهش و تحقیقات بنیادی و کاربردی علم و دانش جدید نیز به‌وجود می‌آورد. در دهه اخیر توجه به توسعه پایدار علمی در ایران از گسترش قابل توجهی برخوردار شده است. قطب‌های علمی با هدف گردهم‌آوری و ...

متن کامل

شناسایی و ارزیابی ریسک های پروژه های سدسازی در مرحله ساخت.

پروژه های سد سازی با توجه به ماهیت ابعاد و پیچیدگی های زیاد و نیز با دارا بودن ساختار فنی و محیطی پویا، دارای ریسک های متعددی هستند که با شناسایی و تحلیل آنها، و با انجام برنامه ریزی و شناخت عدم قطعیت ها به صورت ساختار یافته، می توان برای انواع ریسک ها پاسخی مناسب را اتخاذ و امکان دستیابی پروژه را به موفقیت افزایش داد. غفلت از شناسایی عدم قطعیت هایی که منجر به ایجاد ریسک می شوند و نیز عدم شناسا...

ارزیابی مدیریت ایمنی در پروژه های ساخت و تدوین شاخص های کلیدی عملکرد ایمنی به منظور ارتقاء سطح ایمنی ساخت

با رشد فزاینده میزان پروژه های عمرانی و زیر ساخت در کشورهای در حال توسعه به علت عدم توجه به مسئله ایمنی، میزان حوادت و سوانح وقوع یافته در پروژه ها به شدت افزایش یافته است. با توجه به تاثیرات منفی این حوادت در ابعاد مختلف اعم از اجتماعی، فرهنگی و اقتصادی، صنعت ساخت نیازی مبرم به نگاهی ویژه به مفهوم ایمنی دارد. از آنجا که موفقیت یک پروژه با دستیابی به اهداف آن معنی می یابد، ایمنی، به عنوان یکی ا...

15 صفحه اول

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 4  شماره 4

صفحات  63- 74

تاریخ انتشار 2013-03

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

کلمات کلیدی برای این مقاله ارائه نشده است

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023