Two-stage stochastic programming model for capacitated complete star p-hub network with different fare classes of customers

Authors

  • hamid tikani Department of Industrial Engineering, Yazd University, Yazd, Iran
Abstract:

In this paper, a stochastic programming approach is applied to the airline network revenue management problem. The airline network with the arc capacitated single hub location problem based on complete–star p-hub network is considered. We try to maximize the profit of the transportation company by choosing the best hub locations and network topology, applying revenue management techniques to allocate limited perishable capacity and provide booking limits for all itineraries and fare classes. In order to characterize the uncertainty of demand in the airline market, we introduce stochastic variations caused by seasonally passengers’ demands through a number of scenarios. The proposed model deals with finding the location of hub facilities, the assignment of demand nodes to these located hub facilities and allocating the limited capacity of aircraft seats on each rout to different customer classes in order to maximize the profit. Due to the computational complexity of the resulted model, a hybrid algorithm improved by a caching technique based on standard genetic operators is used to find a near optimal solution of the problem. Numerical experiments are carried out on the Turkish network data set. The performance of the solutions obtained by the proposed algorithm is compared with the pure GA and Imperialist Competitive Algorithm in terms of the computational time requirements and solution quality.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

A Two-Stage Chance-Constraint Stochastic Programming Model for Electricity Supply Chain Network Design

Development of every society is incumbent upon energy sector’s technological and economic effectiveness. The electricity industry is a growing and needs to have a better performance to effectively cover the demand. The industry requires a balance between cost and efficiency through careful design and planning. In this paper, a two-stage stochastic programming model is presented for the design o...

full text

airline hub-median network design by an extended two-stage stochastic programming method: a case study

the hub location decision is a long term investment and any changes in it take considerable time and money. in real situations, some parameters are uncertain hence, deterministic models cannot be more efficient. the ability of two-stage stochastic programming is to make a long-term decision by considering effects of it in short term decisions simultaneously. in the two-stage stochastic programm...

full text

Joint Optimization of Star P-hub Median Problem and Seat Inventory Control Decisions Considering a Hybrid Routing Transportation System

In this paper, we study the problem of integrated capacitated hub location problem and seat inventory control considering concept and techniques of revenue management. We consider an airline company maximizes its revenue by utilizing the best network topology and providing proper booking limits for all itineraries and fare classes. The transportation system arises in the form of a star/star net...

full text

A two-stage stochastic programming model for transportation network protection

This talk discusses some modeling and solution methods for the problem of pre‐disaster transportation network protection against uncertain future disasters. Given limited resources, the goal of the central planner is to choose the best set of network components to protect while allowing the network users to follow their own best perceived routes in any resultant network configuration. This prob...

full text

Reconfiguration of Supply Chain: A Two Stage Stochastic Programming

In this paper, we propose an extended relocation model for warehouses configuration in a supply chain network, in which uncertainty is associated to operational costs, production capacity and demands whereas, existing researches in this area are often restricted to deterministic environments. In real cases, we usually deal with stochastic parameters and this point justifies why the relocation m...

full text

A multi-stage stochastic programming for condition-based maintenance with proportional hazards model

Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 11  issue 1

pages  74- 96

publication date 2018-03-31

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023