Abstract:

In this paper, a comprehensive mathematical model for designing an electric power supply chain network via considering preventive maintenance under risk of network failures is proposed. The risk of capacity disruption of the distribution network is handled via using a two-stage stochastic programming as a framework for modeling the optimization problem. An applied method of planning for the network design and power generation and transmission system via considering failures scenarios, as well as network preventive maintenance schedule, is presented. The aim of the proposed model is to minimize the expected total cost consisting of power plants set-up, power generation and the maintenance activities. The proposed mathematical model is solved by an efficient new accelerated Benders decomposition algorithm. The proposed accelerated Benders decomposition algorithm uses an efficient acceleration mechanism based on the priority method which uses a heuristic algorithm to efficiently cope with computational complexities. A large number of considered scenarios are reduced via using a k-means clustering algorithm to decrease the computational effort for solving the proposed two-stage stochastic programming model. The efficiencies of the proposed model and solution algorithm are examined using data from the Tehran Regional Electric Company. The obtained results indicate that solutions of the stochastic programming are more robust than the obtained solutions provided by a deterministic model.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Benders Decomposition Algorithm for Competitive Supply Chain Network Design under Risk of Disruption and Uncertainty

In this paper, bi-level programming is proposed for designing a competitive supply chain network. A two-stage stochastic programming approach has been developed for a multi-product supply chain comprising a capacitated supplier, several distribution centers, retailers and some resellers in the market. The proposed model considers demand’s uncertainty and disruption in distribution centers and t...

full text

A Benders Decomposition Method for Two-Stage Stochastic Network Design Problems

This paper describes a Benders decomposition algorithm capable of efficiently solving large-scale instances of the well-known multi-commodity capacitated network design problem with demand uncertainty. The problem is important because it models many real-world applications, including telecommunications, transportation, and logistics. This problem has been tackled in the literature with meta-heu...

full text

Hybrid robust and stochastic optimization for closed-loop supply chain network design using accelerated Benders decomposition

Environmental, social and economic concerns motivate the operation of closed-loop supply chain networks (CLSCN) in many industries. We propose a novel profit maximization model for CLSCN design as a mixedinteger linear program inwhich there is flexibility in covering the proportions of demand satisfied and returns collected based on the firm’s policies. Our major contribution is to develop a no...

full text

A Modified Benders Decomposition Algorithm for Supply Chain Network Design under Risk Consideration

In today’s competitive business environment, the design and management of supply chainnetwork is one of the most important challenges that managers encounter. The supply chain network shouldbe designed for satisfying of customer demands as well as minizing the total system costs. This paper presentsa multi-period multi-stage supply chain network design problem under demand uncertainty. The prob...

full text

Benders decomposition for local access network design with two technologies

We have worked with the local access network design problem with two cable technologies. This is an optimization problem in graphs that consists of linking an origin node to a set of terminal nodes which have a flow demand. There are also a set of Steiner or transshipment nodes which do not have demand. Each arc of the graph has two associated costs: a variable cost depending on the flow throug...

full text

A Benders' Decomposition Method to Solve Stochastic Distribution Network Design Problem with Two Echelons and Inter-Depot Transportation

 In many practical distribution networks, managers face significant uncertainties in demand, local price of building facilities, transportation cost, and macro and microeconomic parameters. This paper addresses design of distribution networks in a supply chain system which optimizes the performance of distribution networks subject to required service level. This service level, which is consider...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 28  issue 2

pages  163- 174

publication date 2017-06