Abstract:
This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, uncertainties of RESs, such as output power of the wind power plant are also taken into account. In the proposed framework, mixed-integer non-linear programming of the HTSS problem is converted into a MIP. Since the objective of the study is to show how GenCosʼ aim to achieve maximum profit, mixed-integer programming is used here. Therefore, to formulate the MIP for the problem of HTSS with a wind power plant in the real-time modeling, some parameters like the impact of valve loading cost (VLC) that are accompanied by linear modeling, are considered. Furthermore, in thermal units, parameters such as prohibited operating zones (POZs) and different uncertainties like the energy price and wind power are included to formulate the problem more suitably. The point that is worth noting is the use of dynamic ramp rate (DRR). Also, the application of multi-functional curves (L) of hydro plants is considered when studying inter-unit scheduling. Finally, the required tests are conducted on a modified IEEE 118-bus system to verify the accuracy and methodology of the proposed method.
similar resources
Large-Scale Stochastic Mixed-Integer Programming Algorithms for Power Generation Scheduling
This chapter presents a stochastic unit commitment model for power systems and revisits parallel decomposition algorithms for these types of models. The model is a two-stage stochastic programming problem with first-stage binary variables and second-stage mixed-binary variables. The here-and-now decision is to find day-ahead schedules for slow thermal power generators. The wait-and-see decision...
full textScheduling security constraint unit commitment for power system including stochastic wind power generation
This paper introduces a new approach for scheduling security constraint unit commitment (SCUC) including wind farms. Because of uncertainty in wind power production, we tried to develop a new method for incorporating wind power generation in power plant scheduling. For this, wind power generation modeled with unit commitment in a non-linear optimization problem and simulated by submitting diffe...
full textwind farm impact on generation adequacy in power systems
در سال های اخیر به دلیل افزایش دمای متوسط کره زمین، بشر به دنبال روش های جایگزین برای تامین توان الکتریکی مورد نیاز خود بوده و همچنین در اکثر نقاط جهان سوزاندن سوخت های فسیلی در نیروگاه های حرارتی به عنوان مهم ترین روش تولید توان الکتریکی مطرح بوده است. به دلیل توجه به مسایل زیست محیطی، استفاده از منابع انرژی تجدید پذیر در سال های اخیر شدت یافته است. نیروگاه های بادی به عنوان یک منبع تولید توان...
15 صفحه اولShort-term Hydro Scheduling using Integer Programming: Management and Modelling Issues
The scheduling of hydro stations has stochastic, integer, non-linear, and continuous time aspects, with all the approaches described to date making some simplifying assumption about one or other of these aspects. The (integer) unit commitment decision has received relatively little attention, partly because the resulting problem was deemed intractable given the potential gains in efficiency. Ho...
full textShort Term Hydro Thermal Scheduling Problem: a Review
Operation of a system having both hydro and thermal plants is far more complex and is of much more importance in a modern interconnected power system. The objective of the STHS problem is to optimize the electricity production, considering a short-term planning horizon. This paper presents an extensive review of a short term hydro thermal scheduling problem. The paper demonstrates results of va...
full textShort Term Hydro-Thermal Scheduling using Artificial Immunue System
Artificial Immune System is applied to determine the optimal hourly schedule of power generation in a hydrothermal system. A multi-reservoir cascaded hydroelectric system with a nonlinear relationship between water discharge rate, net head and power generation is considered. The water transport delay between connected reservoirs is taken into account. The transmission losses are also taken into...
full textMy Resources
Journal title
volume 8 issue 3
pages 195- 208
publication date 2020-12-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023