Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints

Authors

  • Mohammed Dahane Université de Lorraine, LGIPM, 57000, Metz, France
  • Mohammed Haoues Laboratory of Automatic and Manufacturing, Industrial Engineering Department, Batna 2 University, 53, route de Constantine, Fésdis, Batna, 05078, Algeria
  • Nadia Kinza Mouss Laboratory of Automatic and Manufacturing, Industrial Engineering Department, Batna 2 University, 53, route de Constantine, Fésdis, Batna, 05078, Algeria
Abstract:

In this paper, we focus on outsourcing activities optimization problem in single period setting. In some situations, capacity planning or outsourcing is a one-time event and can be modeled as a single period problem. The aim of this research is to balance the trade-off between two echelons of a supply chain consisting of a single outsourcer and a single subcontractor. Each part is composed of a failure-prone single machine that produces one product type to satisfy market requirements. The outsourcer’s manufacturing system is not able to satisfy the demand; in this case, outsourcing is allowed to recover the lack of capacity. We consider that the subcontractor can satisfy the demands of strategic clients and rent his machine for the outsourcer under a win–win partnership contract. We assume that the hazard failure rate depends on time and the adopted manufacture rate. When unforeseen failures occur, minimal repairs are implemented. Overhaul can be performed to reduce the degradation effects. Hence, we develop a mathematical model to define a profitability interval so that both parties of supply chain can be considered as winners. We seek to determine the contract parameters that suit both parties (duration, start and end dates, the production and outsourcing rates). Then, we develop an exact algorithm to solve the problem of single period optimization, which offers a better execution time through a series of test problems. Finally, we consider a sensitivity analysis based on outsourcing parameters (cost, periodicities, etc) to analyze their effects on partial costs and individual profit of each part, as well as the total profit generated by the system.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Reliability optimization problems with multiple constraints under fuzziness

In reliability optimization problems diverse situation occurs due to which it is not always possible to get relevant precision in system reliability. The imprecision in data can often be represented by triangular fuzzy numbers. In this manuscript, we have considered different fuzzy environment for reliability optimization problem of redundancy. We formulate a redundancy allocation problem for a...

full text

Rolling Stock Rostering Optimization Under Maintenance Constraints

This paper presents an integer programming formulation for integrating maintenance planning tasks in the railway rolling stock circulation problem. This is a key problem in railway rostering planning that requires to cover a given set of services and maintenance works with a minimum amount of rolling stock units. An additional objective is to limit the number of empty rides. The constraints of ...

full text

Investment optimization under constraints

We analyze general stochastic optimization financial problems under constraints in a general framework, which includes financial models with some “imperfection”, such as constrained portfolios, labor income, random endowment and large investor models. By using general optional decomposition under constraints in a multiplicative form, we first develop a dual formulation under minimal assumption ...

full text

Optimization Under Unknown Constraints

Optimization of complex functions, such as the output of computer simulators, is a difficult task that has received much attention in the literature. A less studied problem is that of optimization under unknown constraints, i.e., when the simulator must be invoked both to determine the typical real-valued response and to determine if a constraint has been violated, either for physical or policy...

full text

Maintenance Outsourcing

Issues By Sandy Dunn, Director, Assetivity Please request permission from the author before copying or distributing this article There are a number of issues facing organisations that are considering maintenance outsourcing as an improvement initiative. Amongst these are the following: To outsource or not outsource strategic decision making Does a competitive outsourcing market exist? How much ...

full text

METAHEURISTIC-BASED SIZING AND TOPOLOGY OPTIMIZATION AND RELIABILITY ASSESSMENT OF SINGLE-LAYER LATTICE DOMES

Economy and safety are two important components in structural design process and stablishing a balance between them indeed results in improved structural performance specially in large-scale structures including space lattice domes. Topology optimization of geometrically nonlinear single-layer lamella, network, and geodesic lattice domes is implemented using enhanced colliding-bodies optimizati...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 15  issue 3

pages  -

publication date 2019-09-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023