OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING
Authors
Abstract:
During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentralized and their distances are long, and second, there are several construction projects undertaken at different time periods. Therefore, appropriate selection of projects with regard to the capabilities of the organization may lead with increasing an expected profitability. This paper investigates the multi-period decentralized multi construction-project and scheduling problem subject to resource constraints, optimal resource pool location, deterioration and batch ordering of nonrenewable resources altogether, for the first time in the literature. In order to describe the problem under consideration in this paper and obtaining the optimal solutions, a mixed integer linear programming model is developed. Finally, the impact of decision integration on the profit profile of an organization is comprehensively investigated by solving numerical examples and through developing some heuristic methods.
similar resources
A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES
In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...
full textMulti-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects
Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...
full textFacility Location and Inventory Balancing in a Multi-period Multi-echelon Multi-objective Supply Chain: An MOEA Approach
A comprehensive and integrated study of any supply chain (SC) environment is a vital requirement that can create various advantages for the SC owners. This consideration causes productive managing of the SC through its whole wide components from upstream suppliers to downstream retailers and customers. On this issue, despite many valuable studies reported in the current literature, considerabl...
full textMulti-period and Multi-objective Stock Selection Optimization Model Based on Fuzzy Interval Approach
The optimization of investment portfolios is the most important topic in financial decision making, and many relevant models can be found in the literature. According to importance of portfolio optimization in this paper, deals with novel solution approaches to solve new developed portfolio optimization model. Contrary to previous work, the uncertainty of future retur...
full textMulti-Objective Optimization for Multi-Product Multi-Period Four Echelon Supply Chain Problems Under Uncertainty
The multi-objective optimization for a multi-product multi-period four-echelon supply chain network consisting of manufacturing plants, distribution centers (DCs) and retailers each with uncertain services and uncertain customer nodes are aimed in this paper. The two objectives are minimization of the total supply chain cost and maximization of the average number of products dispatched to custo...
full textMulti-period Location Allocation Problem with Safety Stock Optimization
The design and management of a multi-stage production/distribution system is one of the most critical problem in logistics and in facility management. This manuscript deals with the so called facility locationallocation problem, i.e. with the simultaneous decisions regarding the design, management, and control of a distribution network. In particular the logistic problem object of this study de...
full textMy Resources
Journal title
volume 9 issue 1
pages 107- 127
publication date 2019-01