Multi-period and multi-resource operating room scheduling and rescheduling using a rolling horizon approach: a case study

Authors

  • Reza Ramezanian Department of Industrial Engineering, K. N. Toosi University of Technology
  • Saiedeh Gholami Department of Industrial Engineering, K.N. Toosi University of Technology
Abstract:

In this paper, a multi-period and multi-resource operating room (OR) scheduling and rescheduling problem with elective and semi-elective (semi-urgent) patients is addressed. A scheduling-rescheduling framework based on the so-called rolling horizon approach is proposed to solve the problem. The core of the proposed framework is a novel proposed mixed-integer linear programming (MILP) model with the objectives of minimizing tardiness, idle time and overtime. Pre-operative holding unit beds and recovery beds as important resources in surgery departments are taken into account. At first, a schedule is set for all of the days of the planning period. Then, at each iteration, the scheduled patients are fixed (frozen) for the first day of the planning period and a rescheduling is done due to arrival of the semi-urgent patients. Then the planning period is shifted. This process continues until all days of the planning horizon are covered. Numerical analysis and comparisons are done between the proposed approach and two scenarios which are applied in many hospitals. In the first scenario, the semi-urgent patients would be operated in the first available OR after operating elective patients and in another scenario, a specified amount of capacity is allocated for semi-elective patients. The outcomes conclude that the proposed method has much better performance and also statistical test supports this superiority. Finally, a case study is implemented in a hospital in Iran. Numerical analysis shows that our proposed approach surpasses the actual schedule of hospital significantly.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

multi-period and multi-resource operating room scheduling and rescheduling using a rolling horizon approach: a case study

in this paper, a multi-period and multi-resource operating room (or) scheduling and rescheduling problem with elective and semi-elective (semi-urgent) patients is addressed. a scheduling-rescheduling framework based on the so-called rolling horizon approach is proposed to solve the problem. the core of the proposed framework is a novel proposed mixed-integer linear programming (milp) model with...

full text

Operating Room Scheduling Considering Patient Priorities and Operating Room Preferences: A Case Study

Operating rooms have become the most important areas in hospitals because of the scarcity and cost of resources. The present study investigates operating room scheduling and rescheduling considering the priority of surgical patients in a specialized hospital. The ultimate purpose of scheduling is to minimize patient waiting time, surgeon idle time between surgeries, and penalties for deviations...

full text

Improvement of operating room performance using a multi-objective mathematical model and data envelopment analysis: A case study

Surgical theater is one of the most expensive hospital sources that a high percentage of hospital admissions are related to it. Therefore, efficient planning and scheduling of the operating rooms (ORs) is necessary to improve the efficiency of any healthcare system. Therefore, in this paper, the weekly OR planning and scheduling problem is addressed to minimize the waiting time of elective pati...

full text

Facility Location and Inventory Balancing in a Multi-period Multi-echelon Multi-objective Supply Chain: An MOEA Approach

A comprehensive and integrated study of any supply chain (SC) environment is a vital requirement that can create various advantages for the SC owners. This consideration causes productive managing of the SC through its whole wide components from upstream suppliers to downstream retailers and customers.  On this issue, despite many valuable studies reported in the current literature, considerabl...

full text

Rolling Horizon Scheduling of Multi-factory Supply Chains

The Virtual Factory is a job shop scheduling tool that was developed at NC State. It has been found to provide nearoptimal solutions to industrial-sized problems in seconds. Recently, the Virtual Factory was expanded to include interfactory transportation operations which enabled the detailed scheduling of entire multi-factory manufacturing supply chains. Separately, a rolling horizon procedure...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 10  issue special issue on healthcare

pages  97- 115

publication date 2017-03-30

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023