Abstract:
Safety risk management has a considerable effect on disproportionate injury rate of construction industry, project cost and both labor and public morale. On the other hand time-cost optimization (TCO) may earn a big profit for project stakeholders. This paper has addressed these issues to present a multi-objective optimization model to simultaneously optimize total time, total cost and overall safety risk (OSR). The present GA-based optimization model possesses significant features of Pareto ranking as selection criterion, elite archiving and adaptive mutation rate. In order to facilitate safety risk assessment in the planning phase, a qualitative activity-based safety risk (QASR) method is also developed. An automated system is codded as an Excel add-in program to facilitate the use of the model for practitioners and researchers. The model has been implemented and verified on a case study successfully. Results indicate that integration of safety risk assessment methods into multi-objective TCO problem improves OSR of nondominated solutions. The robustness of the present optimization model has also been proved by its great ability to prevent genetic drift as well as the improvement in the bicriteria among generations.
similar resources
Multi-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
full textA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
full textOptimization of a Container Ship Dimensions Using Multi-Objective Genetic Algorithm Method
Today, marine transportation has a significant role in global trade. The characteristics of the containerized shipping have made the number of container ships grow every day and made significant improvements in the construction and operation of these ships. In this research, the main dimensions of a container ship are optimized according to different objectives. This optimization aims to reduc...
full textUsing Genetic Algorithm to Robust Multi Objective Optimization of Maintenance Scheduling Considering Engineering Insurance
Efficient and on-time maintenance plays a crucial role inreducing cost and increasing the market share of an industrial unit. Preventivemaintenance is a broad term that encompasses a set of activitiesaimed at improving the overall reliability and availability of a systembefore machinery breakdown. The previous studies have addressed thescheduling of preventive maintenance. These studies have co...
full textMulti Objective Optimization of Time Cost Quality Quantity Using Multi Colony Ant Algorithm
Research on a new metaheuristic for optimization is often initially focused on proof of concept applications. Time and cost are the most important factors to be considered in every construction project. Over the years, many research studies have been conducted to model the time-cost relationship. Construction planners often face the challenge of optimum resources utilization to compromise betwe...
full textMulti-objective Optimization of Time-cost-quality Using Multi-colony Ant Algorithm
Construction planners often face the challenge of optimum resource utilization to compromise between different and usually conflicting aspects of projects. Time, cost and quality of project delivery are among the crucial aspects of each project. Emergence of new contracts that place an increasing pressure on maximizing the quality of projects while minimizing its time and cost, requires the dev...
full textMy Resources
Journal title
volume 4 issue 4
pages 433- 450
publication date 2014-11
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023