Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects
Authors
Abstract:
Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality, carbon dioxide emission and the plan robustness. After presenting the mathematical model of the problem, a genetic algorithm inspired from the role model concept in sociology named Reference Group Genetic Algorithm (RGGA) is used to solve the problem. The “reference group” concept is introduced by a sociologist named Robert K. Merton. He believed that some people in each society such as heroes or entertainment artists affect other people. To evaluate the impact of “reference group” concept in genetic algorithm, RRGA is compared with a similar genetic algorithm that do not use this concept. The originality of this paper is introducing a new multi-objective project scheduling problem, presenting its mathematical model and adapting RGGA to solve it. The computational experiments show that using this concept improves the result.
similar resources
MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-SAFETY USING GENETIC ALGORITHM
Safety risk management has a considerable effect on disproportionate injury rate of construction industry, project cost and both labor and public morale. On the other hand time-cost optimization (TCO) may earn a big profit for project stakeholders. This paper has addressed these issues to present a multi-objective optimization model to simultaneously optimize total time, total cost and overall ...
full textMulti-Objective Optimization of Construction Project Time-Cost-Quality Trade-off Using Differential Evolution Algorithm
Time and cost are among the important aspects considered for every construction project. Many research approaches have been followed to model time-cost relationship. There is a constant rise in the use of innovative contract methods which provide incentives for maximizing quality. There is an increasing pressure to improve the project performance due to the innovative contracting methods which ...
full textA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
full textRobustness Analysis in Evolutionary Multi-Objective Optimization
This paper presents two approaches to robustness analysis in multi-objective optimization problems, in which the model data (coefficients of objective functions, coefficients of constraints, bounds of decision variables, etc.) are subject to small perturbations, with respect to a ”nominal” set of coefficients of the model data. In these approaches, the concept of degree of robustness is incorpo...
full textMulti-objective Optimization of Time-cost-quality Using Multi-colony Ant Algorithm
Construction planners often face the challenge of optimum resource utilization to compromise between different and usually conflicting aspects of projects. Time, cost and quality of project delivery are among the crucial aspects of each project. Emergence of new contracts that place an increasing pressure on maximizing the quality of projects while minimizing its time and cost, requires the dev...
full textMulti Objective Optimization of Time Cost Quality Quantity Using Multi Colony Ant Algorithm
Research on a new metaheuristic for optimization is often initially focused on proof of concept applications. Time and cost are the most important factors to be considered in every construction project. Over the years, many research studies have been conducted to model the time-cost relationship. Construction planners often face the challenge of optimum resources utilization to compromise betwe...
full textMy Resources
Journal title
volume 11 issue 3
pages 0- 0
publication date 2018-07-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023