MILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags
Authors
Abstract:
In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We propose two mixed-integer linear programming (MILP) models and two types of valid inequalities which aim to tighten the models’ representations. One of them is based on dominance rules from the literature. Then, we provide the results of extensive computational experiments used to measure the performance of the proposed MILP models. They are shown to be able to solve optimally instances until the size 40-job and even several larger problem classes, with up to 60 jobs. Furthermore, we can distinguish the effect of the minimal time lags and the inclusion of the valid inequalities in the basic MILP model on the results.
similar resources
Bounds for the permutation flowshop scheduling problem with exact time lags to minimize the total earliness and tardiness
We consider the problem of n-jobs scheduling in an m-machine permutation flowshop with exact time lags between consecutive operations of each job. The exact time lag is defined as the time elapsed between every couple of successive operations of the same job which is equal to a prescribed value. The aim is to find a feasible schedule that minimizes the total tardiness and earliness. We propose ...
full textMILP Formulation and Genetic Algorithm for Non-permutation Flow Shop Scheduling Problem with Availability Constraints
In this paper, we consider a flow shop scheduling problem with availability constraints (FSSPAC) for the objective of minimizing the makespan. In such a problem, machines are not continuously available for processing jobs due to preventive maintenance activities. We proposed a mixed-integer linear programming (MILP) model for this problem which can generate non-permutation schedules. Furthermor...
full textMinimizing the Number of Tardy Jobs in a Permutation Flowshop Scheduling Problem with Setup Times and Time Lags Constraints
This paper studies the permutation flowshop scheduling problem with sequence dependent setup times and time lags constraints minimizing the number of tardy jobs. Dependent setup times are defined as the work to prepare the machines between two successive jobs. Time lags are defined as intervals of time that must exist between every couple of successive operations of the same job. Two mathematic...
full textThe distributed permutation flowshop scheduling problem
This paper studies a new generalization of the regular permutation flowshop scheduling problem (PFSP) referred to as the distributed permutation flowshop scheduling problem or DPFSP. Under this generalization, we assume that there are a total of identical factories or shops, each one with machines disposed in series. A set of n available jobs have to be distributed among the factories and then ...
full textBi-criteria minimization for the permutation flowshop scheduling problem with machine-based learning effects
In traditional scheduling problems, the processing time for the given job is assumed to be a constant regardless of whether the job is scheduled earlier or later. However, the phenomenon named ‘‘learning effect’’ has extensively been studied recently, in which job processing times decline as workers gain more experience. This paper discusses a bi-criteria scheduling problem in anm-machine permu...
full textA Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...
full textMy Resources
Journal title
volume 15 issue 1
pages -
publication date 2019-12-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023