Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
Authors
Abstract:
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies and evaluates critical risks of EPC projects using multi criteria decision making (MCDM) techniques. Then, by the means of developed earned value management (EVM) technique and considering Project Risk index (PRI), this work will proceed to estimate the degree of risk effects on project objectives. The optimal control measures (CMs) to address the risks are found through a goal programming model. The methodology was implemented on a case study in oil and gas industry in Iran. Results of this study show the impact of critical risks on objectives of EPC projects.
similar resources
a study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولA Methodology to Prioritize the Construction Projects of New Railway Infrastructures for Privatization in Railway Networks (Case Study: Iran)
This study aims to develop a novel methodology to prioritize the construction of new railway infrastructures for privatization. The private sector can cooperate to solve the capacity problems of railway networks, by the construction of new infrastructure. The purpose of this study is to answer the basic question that whether the capacity problems of the railway networks can be solved simply by ...
full textconstruction and validation of a computerized adaptive translation test (a receptive based study)
آزمون انطباقی رایانه ای (cat) روشی نوین برای سنجش سطح علمی دانش آموزان می باشد. در حقیقت آزمون های رایانه ای با سرعت بالایی به سمت و سوی جایگزین عملی برای آزمون های کاغذی می روند (کینگزبری، هاوسر، 1993). مقاله حاضر به دنبال آزمون انطباقی رایانه ای برای ترجمه می باشد. بدین منظور دو پرسشنامه مشتمل بر 55 تست ترجمه میان 102 آزمودنی و 10 مدرس زبان انگلیسی پخش گردید. پرسشنامه اول میان 102 دانشجوی س...
1 A hybrid MCDM technique for risk management in 2 construction projects 3
Multi-stakeholder based construction projects are subject to various risk factors due to 17 dynamic business environments. These risks affect project activities which indirectly impact 18 construction costs, resulting in delays and poor building quality. So, managing these project risks 19 requires suitable risk mitigation strategies to evaluate and analyse their severity. Hence, risk 20 evalua...
full textDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
full textCost Optimal Selection of Storage Tanks in LPG Vaporization Station
Liquefied petroleum gas (LPG) is an important urban gas source in China. Before supplied to customers by pipeline supply systems, LPG is stored in tanks in LPG vaporization stations. Designers usually decide the number and the size of storage tanks by their experience during constructions of vaporization stations. These decisions are usually not best and most economical. To solve the problem, a...
full textMy Resources
Journal title
volume 8 issue 3
pages 1- 23
publication date 2015-07-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023