Mathematical Programming Approach To Allocate Local Or National Resources For Bridge Maintenance Rehabilitation & Replacement Planning (RESEARCH NOTE)
Authors
Abstract:
Today’s, the transportation facilities such as terminals, street, bridge, etc, represent the major investment in highway network. Every year tremendous resources should be invested to maintain these facilities. Among them, the Bridge Management System (B.M.S.) has been necessitated by large imbalance between extensive bridge repair and maintenance needs and limited available budget. So the main purpose of this research study is to develop an optimization methodology to allocate the limited resource among the most bridge maintenance demanded projects. The reduction of user cost or increased the user benefit can be considered as the main objective function of the developed Dynamic Programming Optimization Model. The results of the implementing of optimization model shows a tremendous cost savings, and as a result, more demanded bridge requiring the maintenance can be selected.
similar resources
Strategic Planning for the National Bridge Stock of Iran
The National Bridge Stock of Iran consists of about 330,000 bridges, of which around 50% are older than 30 years. Since 2010, Iran Road Maintenance & Transportation Organization has started implementing a comprehensive Bridge Management System in order to manage this aged stock efficiently. To predict future conditions of bridge stock, a heuristic numerical method is presented. This methodology...
full textUsing linear programming to allocate resources in communication systems
We consider the following communications system: A mobile cellular telephone company would like to serve K users simultaneously. Each user (transmitter) transmits data to the company’s base station (receiver) in the form of bits (0’s and 1’s). By modulating electromagnetic waves of different frequencies, each user’s data can be transmitted on a fixed set of “frequency slots” approved the govern...
full textHow to Allocate Resources For Features Acquisition?
We study classification problems where features are corrupted by noise and where the magnitude of the noise in each feature is influenced by the resources allocated to its acquisition. This is the case, for example, when multiple sensors share a common resource (power, bandwidth, attention, etc.). We develop a method for computing the optimal resource allocation for a variety of scenarios and d...
full textstrategic planning for the national bridge stock of iran
the national bridge stock of iran consists of about 330,000 bridges, of which around 50% are older than 30 years. since 2010, iran road maintenance & transportation organization has started implementing a comprehensive bridge management system in order to manage this aged stock efficiently. to predict future conditions of bridge stock, a heuristic numerical method is presented. this methodology...
full textUsing Performance Prediction to Allocate Grid Resources
Large-scale applications often require computational grids to obtain the needed compute power for execution. Generally, users are given access to a collection of resources that can be used for execution. The collection of resources can be dynamic, and the users must decide which collection of heterogeneous and distributed resources to use. However, many users often do not have knowledge of all ...
full textMy Resources
Journal title
volume 16 issue 4
pages 383- 392
publication date 2003-11-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023